Summary: | 碩士 === 國立交通大學 === 工學院碩士在職專班工程技術與管理組 === 96 === ABSTRACT
The diagram of construction engineering says amount and category are numerous and need is together completed by several illustrators, however because of illustrator of construct stereoscopic idea and professional ability different, therefore often diagram happen to say size and content can't to in response to the condition, past at the construction ago need advanced set diagram homework in the line.The origin studies first and say construction diagram of the actual situation set diagram process is an explanation, and look back certain first grade construction company in Taipei City, the set of its construction engineering construction diagram Tai kind with false diagram, put forth a basic processing suggestion to the familiar set Tai kind with false diagram secondly, familiar set it has the set Tai kind with false diagram of keys to have most in the middle of the Tai kind with false diagram:Gao Cheng2 not agrees with, size mistake, CAD diagram file diagram layer mistake, repair to accept head, diagram to say and mark list inconformity, revise incompletion, deliver correction and modify a message to deliver incompletely etc.7;The basic processing suggests as:(A)The processing of chart question, through the painting not certain of engineer go to workplace, the communication solve, or discusses in good time that the diagram says size while being within the reach of.(Two)Existing engineering document(building and structure, machine electricity's etc. send report diagram, related explanation of the engineering construction and material standard and repair diagram and contract, workplace the minutes) etc. data detailed read.(Three)Through the pure diagram, tidy up diagram to say medium doubtful point and related problem, distinguish doubtful point and related problem to be juxtaposed form.(Four)Track owner, architect, provide to suggest a project on one's own initiative, work out a problem by acceleration.(Five)Before material orders, confirm chart size again the exactitude deny, and tell the manufacture the manufacturer.(Six)Light box stall made to must confirm diagram first to say a version time ago.(Seven)The aluminum doors and windows openings size must x-rated control, contracting for job should not change, or must hand over to connect definitely.(Eight)Each workplace the minutes, must
|