The use of simulation optimization to implement lean system design of TFT-LCD automated material handling systems

碩士 === 國立成功大學 === 製造工程研究所碩博士班 === 96 === More store space is due to the increase of panal’s size in TFT-LCD manufacturing, that means increasing necessity of stocker space and cost from accumulated WIP. This paper proposes a lean pull strategy, combining supermarket with CONWIP, which is applying a...

Full description

Bibliographic Details
Main Authors: Bing-Yuan Cheng, 程炳源
Other Authors: Taho Yang
Format: Others
Language:zh-TW
Online Access:http://ndltd.ncl.edu.tw/handle/04452053361733309949
id ndltd-TW-096NCKU5621008
record_format oai_dc
spelling ndltd-TW-096NCKU56210082016-05-09T04:14:17Z http://ndltd.ncl.edu.tw/handle/04452053361733309949 The use of simulation optimization to implement lean system design of TFT-LCD automated material handling systems 以模擬最佳化進行TFT-LCD自動物料搬運系統之精實系統設計 Bing-Yuan Cheng 程炳源 碩士 國立成功大學 製造工程研究所碩博士班 96 More store space is due to the increase of panal’s size in TFT-LCD manufacturing, that means increasing necessity of stocker space and cost from accumulated WIP. This paper proposes a lean pull strategy, combining supermarket with CONWIP, which is applying a viewpoint of shared resources to a re-entrant process in TFT-LCD manufacturing. By using simulation optimization to solve stockers design problem to find more efficient ways of utilizing stocker. Furthermore, using cycle time.to be an appropriate performance measure for answering the improvement of WIP and stocker utilization. This paper also proposes to use Womack’s lean thinking and Rother’s 7 guiding principles procedure as applying the lean pull strategy. The proposed procedure is illustrated to begin defining value, to address the critical improvement point through the current value stream mapping, to solve the optimal problem by using simulation optimization, and to draw the future value stream mapping for implementing the improved alternative. Besides, we implemented the proposed procedure to a real-world TFT-LCD Array process. After we compared current-state map and future-state map, the results indicated that the optimal solution could reduce the average cycle time from 5.08 days to 3.32 days as well as the maximum stocker utilization could be reduced from 62.13% to 18.49% without any extra investment or facilities shifting. In terms of sensitivity analysis, we had found the maximum daily throughput that would be 4500 glasses. It is important to extend capacities for reference. Taho Yang 楊大和 學位論文 ; thesis 121 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 製造工程研究所碩博士班 === 96 === More store space is due to the increase of panal’s size in TFT-LCD manufacturing, that means increasing necessity of stocker space and cost from accumulated WIP. This paper proposes a lean pull strategy, combining supermarket with CONWIP, which is applying a viewpoint of shared resources to a re-entrant process in TFT-LCD manufacturing. By using simulation optimization to solve stockers design problem to find more efficient ways of utilizing stocker. Furthermore, using cycle time.to be an appropriate performance measure for answering the improvement of WIP and stocker utilization. This paper also proposes to use Womack’s lean thinking and Rother’s 7 guiding principles procedure as applying the lean pull strategy. The proposed procedure is illustrated to begin defining value, to address the critical improvement point through the current value stream mapping, to solve the optimal problem by using simulation optimization, and to draw the future value stream mapping for implementing the improved alternative. Besides, we implemented the proposed procedure to a real-world TFT-LCD Array process. After we compared current-state map and future-state map, the results indicated that the optimal solution could reduce the average cycle time from 5.08 days to 3.32 days as well as the maximum stocker utilization could be reduced from 62.13% to 18.49% without any extra investment or facilities shifting. In terms of sensitivity analysis, we had found the maximum daily throughput that would be 4500 glasses. It is important to extend capacities for reference.
author2 Taho Yang
author_facet Taho Yang
Bing-Yuan Cheng
程炳源
author Bing-Yuan Cheng
程炳源
spellingShingle Bing-Yuan Cheng
程炳源
The use of simulation optimization to implement lean system design of TFT-LCD automated material handling systems
author_sort Bing-Yuan Cheng
title The use of simulation optimization to implement lean system design of TFT-LCD automated material handling systems
title_short The use of simulation optimization to implement lean system design of TFT-LCD automated material handling systems
title_full The use of simulation optimization to implement lean system design of TFT-LCD automated material handling systems
title_fullStr The use of simulation optimization to implement lean system design of TFT-LCD automated material handling systems
title_full_unstemmed The use of simulation optimization to implement lean system design of TFT-LCD automated material handling systems
title_sort use of simulation optimization to implement lean system design of tft-lcd automated material handling systems
url http://ndltd.ncl.edu.tw/handle/04452053361733309949
work_keys_str_mv AT bingyuancheng theuseofsimulationoptimizationtoimplementleansystemdesignoftftlcdautomatedmaterialhandlingsystems
AT chéngbǐngyuán theuseofsimulationoptimizationtoimplementleansystemdesignoftftlcdautomatedmaterialhandlingsystems
AT bingyuancheng yǐmónǐzuìjiāhuàjìnxíngtftlcdzìdòngwùliàobānyùnxìtǒngzhījīngshíxìtǒngshèjì
AT chéngbǐngyuán yǐmónǐzuìjiāhuàjìnxíngtftlcdzìdòngwùliàobānyùnxìtǒngzhījīngshíxìtǒngshèjì
AT bingyuancheng useofsimulationoptimizationtoimplementleansystemdesignoftftlcdautomatedmaterialhandlingsystems
AT chéngbǐngyuán useofsimulationoptimizationtoimplementleansystemdesignoftftlcdautomatedmaterialhandlingsystems
_version_ 1718263447770103808