On constructing stable project baseline schedules with time constraints
碩士 === 國立成功大學 === 工業與資訊管理學系碩博士班 === 96 === In this thesis, we first propose a random project scheduling network generator by integrating additional time window or time schedule constraints with a popular project network generator (RanGen). We then give two polynomial heuristic algorithms (Greedy I a...
Main Authors: | Cheng-Kun Yang, 楊橙坤 |
---|---|
Other Authors: | I-Lin Wang |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/83475717697428706085 |
Similar Items
-
Scheduling Linear Construction Projects with Constraints on Resource Availability
by: Biruk S., et al.
Published: (2017-03-01) -
ALGORITHMIC CONSTRUCTION SCHEDULES IN CONDITIONS OF TIMING CONSTRAINTS
by: Alexey S. Dobrynin, et al.
Published: (2016-08-01) -
Scheduling Construction Projects Under Fuzzy Modelling of Resource Constraints
by: Kulejewski Janusz, et al.
Published: (2018-01-01) -
Resource Constraint Scheduling in Constraint Programming
by: Yang, Ta Shin, et al.
Published: (1997) -
Resource-constrained Construction Project Scheduling and Rescheduling Using Constraint Programming Techniques
by: Kuo-Chuan Shih, et al.
Published: (2004)