Summary: | 碩士 === 逢甲大學 === 資訊電機工程碩士在職專班 === 96 === This research is to inquires into in high intensive the environment of underground cable, if the burden is lighter, the port toward bitter end consumer voltage heat up the phenomenon, may cause the consumer equipment damage. Therefore, the Taipower Company will add the shunt reactor to provide the time lag in order to mutually the reactive power, in order to in suppress low voltage of the bitter end effectively.
This research intends to use the ATPDraw creates underground cable and the model of synchronous generator, and with distribution constant the component creates the reactor model of the electric circuit of the equivalence of the rounds. It intend in the research to carry on compare with actual data of the measurement of the scene in order to, identify the precision of the model created. At the same time study the re-ignition Overvoltage and current chopping surge and current insulation grade, insure to add the shunt in the top of the bus of the generator the Reactor can match the standard of design.
|