An Empirical Study between TPS,TQM,TPM and Business Performance A-Team Firms in Bicycle's Industry
碩士 === 大葉大學 === 事業經營研究所碩士在職專班 === 96 === For many years, the enterprise develops various management technologies and improvements to boost the operation quality in order to have the business continuity. However, most of the management improving has an aptitude to a single area. For example, IE, QC a...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/22054535546809934402 |
id |
ndltd-TW-096DYU01163014 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-096DYU011630142015-10-13T14:00:25Z http://ndltd.ncl.edu.tw/handle/22054535546809934402 An Empirical Study between TPS,TQM,TPM and Business Performance A-Team Firms in Bicycle's Industry 推行TPS、TQM、TPM與企業績效之實證研究-以自行車產業A-Team廠商為例 Lai,JU-Ding 賴入定 碩士 大葉大學 事業經營研究所碩士在職專班 96 For many years, the enterprise develops various management technologies and improvements to boost the operation quality in order to have the business continuity. However, most of the management improving has an aptitude to a single area. For example, IE, QC and Six-Sigma Analysis in the early stage, all of them focus on the single improving activity in the practice. The weakness is the limited view in the above action. It just avoids the waste, but cannot be positive and aggressive to fulfill the value creation. This study focuses on the supply chain from upper to the lower stage of a certain industry. Through the cooperation of A-Team organization to promote the 3 in 1 system (TPS, TQM, TPM), this study takes the example of 3 in 1 system from the company practice in the reality and empirical the relation between 3 in 1 system and the company operation. A-Team constantly coordinates the main manufacturers and the factories in the lower stage to work out together in the aspect of management, supply chain maintains. Furthermore, A-team helps the companies to disentangle the restriction of the market border and raise the competitive ability by blue-ocean strategy. The questionnaire of this study samples the members of the A-Team organization and focuses on the key managers of the companies, which animate 3 in 1 system. (TPS, TQM, TPM). Via applying the statistic method of Lisrel (Linear Structural Relation), this study plan to empirical the consequence among all the relative factors.. Accordingly, conclude the relative practice and the concept of the management from the study result. Wei,Wen-Chin 魏文欽 2008 學位論文 ; thesis 82 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 大葉大學 === 事業經營研究所碩士在職專班 === 96 === For many years, the enterprise develops various management technologies and improvements to boost the operation quality in order to have the business continuity. However, most of the management improving has an aptitude to a single area. For example, IE, QC and Six-Sigma Analysis in the early stage, all of them focus on the single improving activity in the practice. The weakness is the limited view in the above action. It just avoids the waste, but cannot be positive and aggressive to fulfill the value creation.
This study focuses on the supply chain from upper to the lower stage of a certain industry. Through the cooperation of A-Team organization to promote the 3 in 1 system (TPS, TQM, TPM), this study takes the example of 3 in 1 system from the company practice in the reality and empirical the relation between 3 in 1 system and the company operation. A-Team constantly coordinates the main manufacturers and the factories in the lower stage to work out together in the aspect of management, supply chain maintains. Furthermore, A-team helps the companies to disentangle the restriction of the market border and raise the competitive ability by blue-ocean strategy.
The questionnaire of this study samples the members of the A-Team organization and focuses on the key managers of the companies, which animate 3 in 1 system. (TPS, TQM, TPM). Via applying the statistic method of Lisrel (Linear Structural Relation), this study plan to empirical the consequence among all the relative factors.. Accordingly, conclude the relative practice and the concept of the management from the study result.
|
author2 |
Wei,Wen-Chin |
author_facet |
Wei,Wen-Chin Lai,JU-Ding 賴入定 |
author |
Lai,JU-Ding 賴入定 |
spellingShingle |
Lai,JU-Ding 賴入定 An Empirical Study between TPS,TQM,TPM and Business Performance A-Team Firms in Bicycle's Industry |
author_sort |
Lai,JU-Ding |
title |
An Empirical Study between TPS,TQM,TPM and Business Performance A-Team Firms in Bicycle's Industry |
title_short |
An Empirical Study between TPS,TQM,TPM and Business Performance A-Team Firms in Bicycle's Industry |
title_full |
An Empirical Study between TPS,TQM,TPM and Business Performance A-Team Firms in Bicycle's Industry |
title_fullStr |
An Empirical Study between TPS,TQM,TPM and Business Performance A-Team Firms in Bicycle's Industry |
title_full_unstemmed |
An Empirical Study between TPS,TQM,TPM and Business Performance A-Team Firms in Bicycle's Industry |
title_sort |
empirical study between tps,tqm,tpm and business performance a-team firms in bicycle's industry |
publishDate |
2008 |
url |
http://ndltd.ncl.edu.tw/handle/22054535546809934402 |
work_keys_str_mv |
AT laijuding anempiricalstudybetweentpstqmtpmandbusinessperformanceateamfirmsinbicyclesindustry AT làirùdìng anempiricalstudybetweentpstqmtpmandbusinessperformanceateamfirmsinbicyclesindustry AT laijuding tuīxíngtpstqmtpmyǔqǐyèjīxiàozhīshízhèngyánjiūyǐzìxíngchēchǎnyèateamchǎngshāngwèilì AT làirùdìng tuīxíngtpstqmtpmyǔqǐyèjīxiàozhīshízhèngyánjiūyǐzìxíngchēchǎnyèateamchǎngshāngwèilì AT laijuding empiricalstudybetweentpstqmtpmandbusinessperformanceateamfirmsinbicyclesindustry AT làirùdìng empiricalstudybetweentpstqmtpmandbusinessperformanceateamfirmsinbicyclesindustry |
_version_ |
1717747652136796160 |