The Study of Quarry And Dredge Management Plan For The Che-Shyi River In Central Taiwan
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 96 === Abstract Aggregate is an important construction material for concrete which is essential for construction projects and is no longer viewed as an unlimited natural resource.The river-bed quarries in major rivers in Taiwan have provided major sources of gravel whi...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/32701037875982248508 |
id |
ndltd-TW-096CYUT5582018 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-096CYUT55820182015-11-27T04:04:14Z http://ndltd.ncl.edu.tw/handle/32701037875982248508 The Study of Quarry And Dredge Management Plan For The Che-Shyi River In Central Taiwan 台灣中部濁水溪砂石疏濬管理及實施計畫之研究 Wen-Liang Chang 陳文良 碩士 朝陽科技大學 營建工程系碩士班 96 Abstract Aggregate is an important construction material for concrete which is essential for construction projects and is no longer viewed as an unlimited natural resource.The river-bed quarries in major rivers in Taiwan have provided major sources of gravel which is a raw material for concrete aggregate. The study of the research collected survey and hydrology data to investigate the related hydrological characteristics of the Che-Shyi River in central Taiwan including sediment transportation analysis to better understand the current dredging operation, flood control and gravel exploitation from the river bed.Based on the field survey data, the erosion along the up stream section of the Chi-Chi reservoir in the Che-Shyi River has reached an average depth of 0.35 meter below the river bed between 2001 and 2004. Recently, “Public Bidding Process”and “Separate Exploitation and Sale Operation” have been used by the related river agencies in Taiwan to minimize the illegal gravel exploitation from the river bed of the Che-Shyi River. The separation between the gravel exploitation and sale operation implies that the exploiters do not actually possess the gravel and a lump sum control could effectively reduce the illegal gravel exploitations from the river. At present time, it is commonly recognized that the separation operation is the most feasible and effective for providing a balance between the river dredging, floodcontrol and gravel exploitation operation for the rivers in Taiwan. The results of the study provide not only useful information for better management of the river bed gravel exploitation but also recommendations for the improvement of the future related river managements of the rivers in central Taiwan. Tzyy-Shiou Chang 張子修 2008 學位論文 ; thesis 90 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 96 === Abstract
Aggregate is an important construction material for concrete which is essential for construction projects and is no longer viewed as an unlimited natural resource.The river-bed quarries in major rivers in Taiwan have provided major sources of gravel which is a raw material for concrete aggregate. The study of the research collected survey and hydrology data to investigate the related hydrological characteristics of the Che-Shyi River in central Taiwan including sediment transportation analysis to better understand the current dredging operation, flood control and gravel exploitation from the river bed.Based on the field survey data, the erosion along the up stream section of the Chi-Chi reservoir in the Che-Shyi River has reached an average depth of 0.35 meter below the river bed between 2001 and 2004. Recently, “Public Bidding Process”and “Separate Exploitation and Sale Operation” have been used by the related river agencies in Taiwan to minimize the illegal gravel exploitation from the river bed of the Che-Shyi River. The separation between the gravel exploitation and sale operation implies that the exploiters do not actually possess the gravel and a lump sum control could effectively reduce the illegal
gravel exploitations from the river. At present time, it is commonly recognized that the separation operation is the most feasible and effective for providing a balance between the river dredging, floodcontrol and gravel exploitation operation for the rivers in Taiwan. The results of the study provide not only useful information for better management of the river bed gravel exploitation but also recommendations for the improvement of the future related river managements of the rivers in central Taiwan.
|
author2 |
Tzyy-Shiou Chang |
author_facet |
Tzyy-Shiou Chang Wen-Liang Chang 陳文良 |
author |
Wen-Liang Chang 陳文良 |
spellingShingle |
Wen-Liang Chang 陳文良 The Study of Quarry And Dredge Management Plan For The Che-Shyi River In Central Taiwan |
author_sort |
Wen-Liang Chang |
title |
The Study of Quarry And Dredge Management Plan For The Che-Shyi River In Central Taiwan |
title_short |
The Study of Quarry And Dredge Management Plan For The Che-Shyi River In Central Taiwan |
title_full |
The Study of Quarry And Dredge Management Plan For The Che-Shyi River In Central Taiwan |
title_fullStr |
The Study of Quarry And Dredge Management Plan For The Che-Shyi River In Central Taiwan |
title_full_unstemmed |
The Study of Quarry And Dredge Management Plan For The Che-Shyi River In Central Taiwan |
title_sort |
study of quarry and dredge management plan for the che-shyi river in central taiwan |
publishDate |
2008 |
url |
http://ndltd.ncl.edu.tw/handle/32701037875982248508 |
work_keys_str_mv |
AT wenliangchang thestudyofquarryanddredgemanagementplanforthecheshyiriverincentraltaiwan AT chénwénliáng thestudyofquarryanddredgemanagementplanforthecheshyiriverincentraltaiwan AT wenliangchang táiwānzhōngbùzhuóshuǐxīshāshíshūjùnguǎnlǐjíshíshījìhuàzhīyánjiū AT chénwénliáng táiwānzhōngbùzhuóshuǐxīshāshíshūjùnguǎnlǐjíshíshījìhuàzhīyánjiū AT wenliangchang studyofquarryanddredgemanagementplanforthecheshyiriverincentraltaiwan AT chénwénliáng studyofquarryanddredgemanagementplanforthecheshyiriverincentraltaiwan |
_version_ |
1718137322938040320 |