Simulation Methods of Failure Random Variates Generation for Considering Preventive Maintenance
碩士 === 朝陽科技大學 === 工業工程與管理系碩士班 === 96 === It usually is required to use numerical method to obtain the optimal preventive maintenance (PM) policy since the failure rate function is changed after each PM. This makes the theoretical method complicated to use and is not suitable for real cases. Therefo...
Main Authors: | Shu-Te Fang, 方樹德 |
---|---|
Other Authors: | Chun-Yuan Cheng |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/15023941415431086344 |
Similar Items
-
Optimal generation maintenance scheduling considering financial return and unexpected failure of distributed generation
by: Panit Prukpanit, et al.
Published: (2021-06-01) -
Failure Analysis and Prediction Methods for Preventive Maintenance
by: Shang-Kuo Yang, et al.
Published: (1999) -
Consider reliability to integrating preventive maintenance and production scheduling
by: Chao-Kai Huang, et al.
Published: (2009) -
The Imperfect Preventive Maintenance Models With Considering Cost and Reliability
by: Guan-An Jin, et al.
Published: (2001) -
Two-Dimensional Warranty Model Considering Preventive Maintenance
by: Chia Yen, et al.
Published: (2005)