The Evaluation of Filtering Decommissioning Strategies for Domestic Nuclear Power Plant
碩士 === 中原大學 === 企業管理研究所 === 96 === The first nuclear power plant in Taiwan has been operating for 30 years since 1978. Some facilities and components are worn out and requires constant maintenance. A nuclear power plant has its own life span, but it will be shut down, dismantled and decommissioned,...
Main Authors: | Yu-Ching Hu, 胡毓青 |
---|---|
Other Authors: | 胡宜中 |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/61976731569763258968 |
Similar Items
-
Evaluation of Radionuclides In Concrete Shielding for Nuclear Power Plant Decommission
by: Yeng-Kuang Lin, et al.
Published: (2008) -
Innovative Nuclear Power Plant Building Arrangement in Consideration of Decommissioning
by: Won-Jun Choi, et al.
Published: (2017-04-01) -
Safety Assessment Framework for Nuclear Power Plant Decommissioning Workers
by: Hyungjun Kim, et al.
Published: (2019-01-01) -
A Study of Packing Problems for the Decommissioning Nuclear Power Plant Unit
by: Yan-Zhen Ou, et al.
Published: (2018) -
Containment during the decommissioning of nuclear power plant: calculation and approach associated
by: Le Parc, Samuel
Published: (2019)