An Effectivity Date Decision Model for Engineering Changes
碩士 === 中原大學 === 工業工程研究所 === 96 === For enterprise, market opportunities often initialize lifecycle of a new product development. The cycle then follows by requirement analysis, design, production, and finalized with marketing. Globalized competitive environment has increased the turnover rate of pro...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/53452714422202060940 |
id |
ndltd-TW-096CYCU5030005 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-096CYCU50300052016-05-18T04:13:58Z http://ndltd.ncl.edu.tw/handle/53452714422202060940 An Effectivity Date Decision Model for Engineering Changes 預估工程變更開始生效日之決策模型 Shi-Zhe Liu 劉希哲 碩士 中原大學 工業工程研究所 96 For enterprise, market opportunities often initialize lifecycle of a new product development. The cycle then follows by requirement analysis, design, production, and finalized with marketing. Globalized competitive environment has increased the turnover rate of products. To keep up with the fast paste, the product lifecycle time is becoming shorter and shorter. During the production cycle, when an approved engineering design is not able to be manufactured with current materials and/or equipments, an engineering change (EC) is required. When EC occurs, the design end needs to change all the related design documents, and the production end needs to reevaluate material purchasing plan and equipments scheduling. All these are time and cost consuming. Effective date is the date that a documented change is implemented and applied to shop floor workshop. Effectivity date is the date that decision makers wish documented changes begin to applied. In normal situations, multiple disciplines, such as design and development, purchasing, shop floor workshop, quality control, and so on, are involved in a change decision, which will be made on when a change is to become effective. In this thesis, a mixed Integer programming effectivity decision model is proposed to support changes of the design and production ends synchronously when an engineering change occurred. The proposed model succeeds in an integration of the change management problems (from PDM perspective) and production planning and shop floor scheduling problems (from ERP perspective). 蕭俊彥 2008 學位論文 ; thesis 75 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 中原大學 === 工業工程研究所 === 96 === For enterprise, market opportunities often initialize lifecycle of a new product development. The cycle then follows by requirement analysis, design, production, and finalized with marketing. Globalized competitive environment has increased the turnover rate of products. To keep up with the fast paste, the product lifecycle time is becoming shorter and shorter. During the production cycle, when an approved engineering design is not able to be manufactured with current materials and/or equipments, an engineering change (EC) is required. When EC occurs, the design end needs to change all the related design documents, and the production end needs to reevaluate material purchasing plan and equipments scheduling. All these are time and cost consuming.
Effective date is the date that a documented change is implemented and applied to shop floor workshop. Effectivity date is the date that decision makers wish documented changes begin to applied. In normal situations, multiple disciplines, such as design and development, purchasing, shop floor workshop, quality control, and so on, are involved in a change decision, which will be made on when a change is to become effective.
In this thesis, a mixed Integer programming effectivity decision model is proposed to support changes of the design and production ends synchronously when an engineering change occurred. The proposed model succeeds in an integration of the change management problems (from PDM perspective) and production planning and shop floor scheduling problems (from ERP perspective).
|
author2 |
蕭俊彥 |
author_facet |
蕭俊彥 Shi-Zhe Liu 劉希哲 |
author |
Shi-Zhe Liu 劉希哲 |
spellingShingle |
Shi-Zhe Liu 劉希哲 An Effectivity Date Decision Model for Engineering Changes |
author_sort |
Shi-Zhe Liu |
title |
An Effectivity Date Decision Model for Engineering Changes |
title_short |
An Effectivity Date Decision Model for Engineering Changes |
title_full |
An Effectivity Date Decision Model for Engineering Changes |
title_fullStr |
An Effectivity Date Decision Model for Engineering Changes |
title_full_unstemmed |
An Effectivity Date Decision Model for Engineering Changes |
title_sort |
effectivity date decision model for engineering changes |
publishDate |
2008 |
url |
http://ndltd.ncl.edu.tw/handle/53452714422202060940 |
work_keys_str_mv |
AT shizheliu aneffectivitydatedecisionmodelforengineeringchanges AT liúxīzhé aneffectivitydatedecisionmodelforengineeringchanges AT shizheliu yùgūgōngchéngbiàngèngkāishǐshēngxiàorìzhījuécèmóxíng AT liúxīzhé yùgūgōngchéngbiàngèngkāishǐshēngxiàorìzhījuécèmóxíng AT shizheliu effectivitydatedecisionmodelforengineeringchanges AT liúxīzhé effectivitydatedecisionmodelforengineeringchanges |
_version_ |
1718271702243213312 |