Exploring Project Management Methodology as a Practical Solution for Balanced Scorecard Process

碩士 === 長榮大學 === 企業管理學系碩士班 === 97 === Abstract Most companies recognize the need to use the balance scorecard (BSC) in order to assess and measure how corporate efforts contribute to overall organizational objectives. By using the project management (PM) methodology in BSC implementation, project...

Full description

Bibliographic Details
Main Authors: Pei-Chun Liu, 劉倍君
Other Authors: Chun-Hsien Su
Format: Others
Language:en_US
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/06270426338632551204
id ndltd-TW-096CJU00121024
record_format oai_dc
spelling ndltd-TW-096CJU001210242015-11-20T04:22:50Z http://ndltd.ncl.edu.tw/handle/06270426338632551204 Exploring Project Management Methodology as a Practical Solution for Balanced Scorecard Process 探討專案管理方法論於平衡計分卡導入之實務應用 Pei-Chun Liu 劉倍君 碩士 長榮大學 企業管理學系碩士班 97 Abstract Most companies recognize the need to use the balance scorecard (BSC) in order to assess and measure how corporate efforts contribute to overall organizational objectives. By using the project management (PM) methodology in BSC implementation, project managers can understand problem areas as well as improving current projects, which would enhance their abilities to take corrective actions that ensure and maximize successful outcomes from implemention (Muller, 2007). The main purpose of study is to explore all those preceding problems, and success factors of BSC implemented could be solved by PM methodology. It is expected that this integration will help make the BSC a more viable strategy implementation tool (Othman, 2006). The method of literature review is used in this study. By collecting those literatures about executing BSC implementation with respect to the PM methodology is fairly treated and reviewed sequentially. This study results showed that PM has positive impacts on some issues of the BSC, with relation to management of time, cost, quality, or some of them. Nevertheless, some sub-processes in the fields of procurement are sometimes ignored when firm implemented BSC. Therefore, BSC implementation would be effective achieve organization’s strategy objectives if firms consider the whole PM framework in the future. To conclude, the PM methodology spanning all nine knowledge through BSC implementation are beyond tradition. This study also demonstrates the PM methodology would be full of flexibility to provide a practical solution for BSC implementation. Keyword: Project Management, Balanced Scorecard Chun-Hsien Su 蘇俊憲 2009 學位論文 ; thesis 97 en_US
collection NDLTD
language en_US
format Others
sources NDLTD
description 碩士 === 長榮大學 === 企業管理學系碩士班 === 97 === Abstract Most companies recognize the need to use the balance scorecard (BSC) in order to assess and measure how corporate efforts contribute to overall organizational objectives. By using the project management (PM) methodology in BSC implementation, project managers can understand problem areas as well as improving current projects, which would enhance their abilities to take corrective actions that ensure and maximize successful outcomes from implemention (Muller, 2007). The main purpose of study is to explore all those preceding problems, and success factors of BSC implemented could be solved by PM methodology. It is expected that this integration will help make the BSC a more viable strategy implementation tool (Othman, 2006). The method of literature review is used in this study. By collecting those literatures about executing BSC implementation with respect to the PM methodology is fairly treated and reviewed sequentially. This study results showed that PM has positive impacts on some issues of the BSC, with relation to management of time, cost, quality, or some of them. Nevertheless, some sub-processes in the fields of procurement are sometimes ignored when firm implemented BSC. Therefore, BSC implementation would be effective achieve organization’s strategy objectives if firms consider the whole PM framework in the future. To conclude, the PM methodology spanning all nine knowledge through BSC implementation are beyond tradition. This study also demonstrates the PM methodology would be full of flexibility to provide a practical solution for BSC implementation. Keyword: Project Management, Balanced Scorecard
author2 Chun-Hsien Su
author_facet Chun-Hsien Su
Pei-Chun Liu
劉倍君
author Pei-Chun Liu
劉倍君
spellingShingle Pei-Chun Liu
劉倍君
Exploring Project Management Methodology as a Practical Solution for Balanced Scorecard Process
author_sort Pei-Chun Liu
title Exploring Project Management Methodology as a Practical Solution for Balanced Scorecard Process
title_short Exploring Project Management Methodology as a Practical Solution for Balanced Scorecard Process
title_full Exploring Project Management Methodology as a Practical Solution for Balanced Scorecard Process
title_fullStr Exploring Project Management Methodology as a Practical Solution for Balanced Scorecard Process
title_full_unstemmed Exploring Project Management Methodology as a Practical Solution for Balanced Scorecard Process
title_sort exploring project management methodology as a practical solution for balanced scorecard process
publishDate 2009
url http://ndltd.ncl.edu.tw/handle/06270426338632551204
work_keys_str_mv AT peichunliu exploringprojectmanagementmethodologyasapracticalsolutionforbalancedscorecardprocess
AT liúbèijūn exploringprojectmanagementmethodologyasapracticalsolutionforbalancedscorecardprocess
AT peichunliu tàntǎozhuānànguǎnlǐfāngfǎlùnyúpínghéngjìfēnkǎdǎorùzhīshíwùyīngyòng
AT liúbèijūn tàntǎozhuānànguǎnlǐfāngfǎlùnyúpínghéngjìfēnkǎdǎorùzhīshíwùyīngyòng
_version_ 1718133009102667776