Labor assignment modle for a jazz drum factory consider the bottleneck machine priority
碩士 === 中華大學 === 科技管理學系(所) === 96 === The main purpose of this study is to improve the output of drum kits for a Jazz drum factory, and focuses on the labor assignment problem in the Jazz drum shell construction workstation. This workstation has many machines and only one operator. And this operator...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/00661296528761682756 |