Modeling Project-Based Team Processes : The Design and Implementation of a Dynamic Meeting Flow Planner
碩士 === 長庚大學 === 資訊管理學研究所 === 96 === Projects usually require interdisciplinary expertise and the participation and cooperation of experts of specific fields to complete. There are some scholars proposing the "meeting flow" concept, which aims at resolving the problems the current project c...
Main Authors: | Dong Ting Tsai, 蔡東廷 |
---|---|
Other Authors: | R. L. Tsai |
Format: | Others |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/30992077728294653115 |
Similar Items
-
An automated project planner
by: Sirajuddin, Abdullah Mohammad Yar
Published: (1991) -
Assistant assignment planner system design and implementation
by: Liu, Jun
Published: (2002) -
Perceptions of Risk at Meetings and Conferences: An Event Planner's Perspective
by: Robson, Linda
Published: (2009) -
Perceptions of Risk at Meetings and Conferences: An Event Planner's Perspective
by: Robson, Linda
Published: (2009) -
Cross-Organization Process Re-engineering for Design-Build Project Team
by: Ming-Hsiu Tsai, et al.
Published: (2007)