TPM PartⅡ activity is advanced and researched: A Case Study of a Taiwanese zincplated steel Firm

碩士 === 長庚大學 === 企業管理研究所 === 96 === This research used the zincplated steel plate company as an example to discuss how to implement advanced TPM activity above the present base of TPM. It is a analysis from practical point of view, that a company how to upgrade to PartⅡ after awarding with TPM Excell...

Full description

Bibliographic Details
Main Authors: Jui-Chen Wu, 吳瑞成
Other Authors: W. Y. Lee
Format: Others
Published: 2008
Online Access:http://ndltd.ncl.edu.tw/handle/26681905241068683244
id ndltd-TW-096CGU05121045
record_format oai_dc
spelling ndltd-TW-096CGU051210452016-05-13T04:15:00Z http://ndltd.ncl.edu.tw/handle/26681905241068683244 TPM PartⅡ activity is advanced and researched: A Case Study of a Taiwanese zincplated steel Firm TPMPartⅡ活動實作研究-以台灣某家鍍鋅鋼廠為例 Jui-Chen Wu 吳瑞成 碩士 長庚大學 企業管理研究所 96 This research used the zincplated steel plate company as an example to discuss how to implement advanced TPM activity above the present base of TPM. It is a analysis from practical point of view, that a company how to upgrade to PartⅡ after awarding with TPM Excellence Award by JIPM in PartⅠ,and based on the core of production machines, to keep improving internally, raising the OEE and enhancing company competitiveness. This factory had been doing TPM activity for many years and performed very well. Before TPM activity was implemented in the second half of 2000, their OEE had already reached 80.72%. After TPM activity had been carried out for 4 years, they was awarded with TPM Awards in the second half of 2004, and in 2004, their OEE had increased to 86.29%. This outcome is not only benefited from TPM activity, which has a practical and workable process and steps, the business culture of 「Continues Improvements 」 from all staff is also one of the main reason of the success. It was a turning point after they was awarded with TPM Excellence Award. With strong determination, the company directors announced to challenge further for TPM PartⅡ and TPM Consistent Excellence Award. Therefore, they reviewed present problems of 8 pillars and then formulated concrete policies and strategies. Moreover, with the full support of company directors, TPM activity was implemented successfully, however, there were still some baffles during this process, for example, resistance from some managers and staff in the first line and pillar groups wasted too much time. To those problems mentioned above, this company had already had proper solutions and gained positive outcomes, consequently, they was awarded with TPM Consistent Excellence Award in the second half of 2007 W. Y. Lee 李文義 2008 學位論文 ; thesis 134
collection NDLTD
format Others
sources NDLTD
description 碩士 === 長庚大學 === 企業管理研究所 === 96 === This research used the zincplated steel plate company as an example to discuss how to implement advanced TPM activity above the present base of TPM. It is a analysis from practical point of view, that a company how to upgrade to PartⅡ after awarding with TPM Excellence Award by JIPM in PartⅠ,and based on the core of production machines, to keep improving internally, raising the OEE and enhancing company competitiveness. This factory had been doing TPM activity for many years and performed very well. Before TPM activity was implemented in the second half of 2000, their OEE had already reached 80.72%. After TPM activity had been carried out for 4 years, they was awarded with TPM Awards in the second half of 2004, and in 2004, their OEE had increased to 86.29%. This outcome is not only benefited from TPM activity, which has a practical and workable process and steps, the business culture of 「Continues Improvements 」 from all staff is also one of the main reason of the success. It was a turning point after they was awarded with TPM Excellence Award. With strong determination, the company directors announced to challenge further for TPM PartⅡ and TPM Consistent Excellence Award. Therefore, they reviewed present problems of 8 pillars and then formulated concrete policies and strategies. Moreover, with the full support of company directors, TPM activity was implemented successfully, however, there were still some baffles during this process, for example, resistance from some managers and staff in the first line and pillar groups wasted too much time. To those problems mentioned above, this company had already had proper solutions and gained positive outcomes, consequently, they was awarded with TPM Consistent Excellence Award in the second half of 2007
author2 W. Y. Lee
author_facet W. Y. Lee
Jui-Chen Wu
吳瑞成
author Jui-Chen Wu
吳瑞成
spellingShingle Jui-Chen Wu
吳瑞成
TPM PartⅡ activity is advanced and researched: A Case Study of a Taiwanese zincplated steel Firm
author_sort Jui-Chen Wu
title TPM PartⅡ activity is advanced and researched: A Case Study of a Taiwanese zincplated steel Firm
title_short TPM PartⅡ activity is advanced and researched: A Case Study of a Taiwanese zincplated steel Firm
title_full TPM PartⅡ activity is advanced and researched: A Case Study of a Taiwanese zincplated steel Firm
title_fullStr TPM PartⅡ activity is advanced and researched: A Case Study of a Taiwanese zincplated steel Firm
title_full_unstemmed TPM PartⅡ activity is advanced and researched: A Case Study of a Taiwanese zincplated steel Firm
title_sort tpm partⅱ activity is advanced and researched: a case study of a taiwanese zincplated steel firm
publishDate 2008
url http://ndltd.ncl.edu.tw/handle/26681905241068683244
work_keys_str_mv AT juichenwu tpmpartiiactivityisadvancedandresearchedacasestudyofataiwanesezincplatedsteelfirm
AT wúruìchéng tpmpartiiactivityisadvancedandresearchedacasestudyofataiwanesezincplatedsteelfirm
AT juichenwu tpmpartiihuódòngshízuòyánjiūyǐtáiwānmǒujiādùxīngāngchǎngwèilì
AT wúruìchéng tpmpartiihuódòngshízuòyánjiūyǐtáiwānmǒujiādùxīngāngchǎngwèilì
_version_ 1718266517970223104