A Study Using Dynamic Simulation and SCOR in Moving Scaffolding System Method Performance Analysis
碩士 === 國立雲林科技大學 === 營建工程系碩士班 === 95 === The features of construction supply chain project cover all different kinds of product, service, and commercial benefits. There are many core problems exist inside the supply chain such as delivery time delay, cost, quality and the dispersion of construction d...
Main Authors: | Jie-Yuan Peng, 彭傑源 |
---|---|
Other Authors: | Nai-Hsin Pan |
Format: | Others |
Language: | zh-TW |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/08081668589132349681 |
Similar Items
-
A Concept of Simulation-based SC Performance Analysis Using SCOR Metrics
by: Šitova Irīna, et al.
Published: (2017-12-01) -
Analysis of scor implementation at peab
by: Gyllin, Glenn, et al.
Published: (2010) -
Simulate the SCOR Process with Time Based Petri Net
by: Chih-Hao Weng, et al.
Published: (2004) -
Analysis of Notebook Purchase by SCOR Model
by: Wang, Jui-Lin, et al.
Published: (2010) -
Evaluation of Supply Chain Management Performance at MSMEs using the SCOR Method
by: Felia Anjani Ramadheena, et al.
Published: (2020-08-01)