Evaluation of Pumping and Rainfall on Groundwater Fluctuation and Ground Movement

碩士 === 國立雲林科技大學 === 營建工程系碩士班 === 95 === Province Road 18, or so-called Alishan Road, has been experienced problems of landslip or road subsidence as a result of typhoons or heavy rainfalls since the road construction. On June 26, 2003, a significant landslide occurred at the mileage of 31.5K along...

Full description

Bibliographic Details
Main Authors: Bu-Ru Li, 李柏儒
Other Authors: none
Format: Others
Language:zh-TW
Published: 2007
Online Access:http://ndltd.ncl.edu.tw/handle/50737347274055397785
id ndltd-TW-095YUNT5582020
record_format oai_dc
spelling ndltd-TW-095YUNT55820202016-05-20T04:17:56Z http://ndltd.ncl.edu.tw/handle/50737347274055397785 Evaluation of Pumping and Rainfall on Groundwater Fluctuation and Ground Movement 抽水與降雨對地下水位與地層位移之影響評估 Bu-Ru Li 李柏儒 碩士 國立雲林科技大學 營建工程系碩士班 95 Province Road 18, or so-called Alishan Road, has been experienced problems of landslip or road subsidence as a result of typhoons or heavy rainfalls since the road construction. On June 26, 2003, a significant landslide occurred at the mileage of 31.5K along the road. The government agency-in-charge, District V, Directorate General of Highways, was therefore installing 6 deep discharge wells at the site (T-1~T-6) in order to lower down the highly raised groundwater level during the heavy rainfall season and to increase the stability of the slope. The study herein was conducted on the discharge well T-2. With the installation of flow meter and piezometer in the well, this paper discusses results of the monitoring and the effect of the pumping / precipitation on the groundwater level and slope deformation at the site. none 張睦雄 2007 學位論文 ; thesis 279 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立雲林科技大學 === 營建工程系碩士班 === 95 === Province Road 18, or so-called Alishan Road, has been experienced problems of landslip or road subsidence as a result of typhoons or heavy rainfalls since the road construction. On June 26, 2003, a significant landslide occurred at the mileage of 31.5K along the road. The government agency-in-charge, District V, Directorate General of Highways, was therefore installing 6 deep discharge wells at the site (T-1~T-6) in order to lower down the highly raised groundwater level during the heavy rainfall season and to increase the stability of the slope. The study herein was conducted on the discharge well T-2. With the installation of flow meter and piezometer in the well, this paper discusses results of the monitoring and the effect of the pumping / precipitation on the groundwater level and slope deformation at the site.
author2 none
author_facet none
Bu-Ru Li
李柏儒
author Bu-Ru Li
李柏儒
spellingShingle Bu-Ru Li
李柏儒
Evaluation of Pumping and Rainfall on Groundwater Fluctuation and Ground Movement
author_sort Bu-Ru Li
title Evaluation of Pumping and Rainfall on Groundwater Fluctuation and Ground Movement
title_short Evaluation of Pumping and Rainfall on Groundwater Fluctuation and Ground Movement
title_full Evaluation of Pumping and Rainfall on Groundwater Fluctuation and Ground Movement
title_fullStr Evaluation of Pumping and Rainfall on Groundwater Fluctuation and Ground Movement
title_full_unstemmed Evaluation of Pumping and Rainfall on Groundwater Fluctuation and Ground Movement
title_sort evaluation of pumping and rainfall on groundwater fluctuation and ground movement
publishDate 2007
url http://ndltd.ncl.edu.tw/handle/50737347274055397785
work_keys_str_mv AT buruli evaluationofpumpingandrainfallongroundwaterfluctuationandgroundmovement
AT lǐbǎirú evaluationofpumpingandrainfallongroundwaterfluctuationandgroundmovement
AT buruli chōushuǐyǔjiàngyǔduìdexiàshuǐwèiyǔdecéngwèiyízhīyǐngxiǎngpínggū
AT lǐbǎirú chōushuǐyǔjiàngyǔduìdexiàshuǐwèiyǔdecéngwèiyízhīyǐngxiǎngpínggū
_version_ 1718272993961967616