Possibilistic Programming Models for Activity Network Analysis with Fuzzy Durations
碩士 === 南台科技大學 === 工業管理研究所 === 95 === Lin and Lee (2004) proposed two methods for time analysis of activity networks with fuzzy activity durations. Their methods are based on fuzzy arithmetic and parametric analysis, respectively. The method based on parametric analysis is developed for applications...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/75824872731111891928 |
id |
ndltd-TW-095STUT0041006 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-095STUT00410062016-11-22T04:12:46Z http://ndltd.ncl.edu.tw/handle/75824872731111891928 Possibilistic Programming Models for Activity Network Analysis with Fuzzy Durations 可能性規劃於模糊專案排程之應用 YUNG, YA-CHU 雍雅筑 碩士 南台科技大學 工業管理研究所 95 Lin and Lee (2004) proposed two methods for time analysis of activity networks with fuzzy activity durations. Their methods are based on fuzzy arithmetic and parametric analysis, respectively. The method based on parametric analysis is developed for applications in large-scale networks, and was derived based on Lin and Chern’s (1993) fuzzy linear programming approach. In this study, we consider the problem how to reduce the computational complexity of their parametric analysis method. In particular, we solve the parametric time analysis problem using the shortest path simplex method. Since time analysis is usually just for trying in the planning of a project, the acquirement and deployment of resources, and the execution of activities are following the project schedule, not the simple time analysis. In this study, we also propose two possibilistic chance constraint models for project scheduling, which are based on Liu and Iwamura’s (1998a) minimin model and Liu’s (1998) maximin model, respectively. Based on the results of time analysis, we show that these two models can be solved by using the forward pass method. 林高正 2007 學位論文 ; thesis 60 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 南台科技大學 === 工業管理研究所 === 95 === Lin and Lee (2004) proposed two methods for time analysis of activity networks with fuzzy activity durations. Their methods are based on fuzzy arithmetic and parametric analysis, respectively. The method based on parametric analysis is developed for applications in large-scale networks, and was derived based on Lin and Chern’s (1993) fuzzy linear programming approach. In this study, we consider the problem how to reduce the computational complexity of their parametric analysis method. In particular, we solve the parametric time analysis problem using the shortest path simplex method. Since time analysis is usually just for trying in the planning of a project, the acquirement and deployment of resources, and the execution of activities are following the project schedule, not the simple time analysis. In this study, we also propose two possibilistic chance constraint models for project scheduling, which are based on Liu and Iwamura’s (1998a) minimin model and Liu’s (1998) maximin model, respectively. Based on the results of time analysis, we show that these two models can be solved by using the forward pass method.
|
author2 |
林高正 |
author_facet |
林高正 YUNG, YA-CHU 雍雅筑 |
author |
YUNG, YA-CHU 雍雅筑 |
spellingShingle |
YUNG, YA-CHU 雍雅筑 Possibilistic Programming Models for Activity Network Analysis with Fuzzy Durations |
author_sort |
YUNG, YA-CHU |
title |
Possibilistic Programming Models for Activity Network Analysis with Fuzzy Durations |
title_short |
Possibilistic Programming Models for Activity Network Analysis with Fuzzy Durations |
title_full |
Possibilistic Programming Models for Activity Network Analysis with Fuzzy Durations |
title_fullStr |
Possibilistic Programming Models for Activity Network Analysis with Fuzzy Durations |
title_full_unstemmed |
Possibilistic Programming Models for Activity Network Analysis with Fuzzy Durations |
title_sort |
possibilistic programming models for activity network analysis with fuzzy durations |
publishDate |
2007 |
url |
http://ndltd.ncl.edu.tw/handle/75824872731111891928 |
work_keys_str_mv |
AT yungyachu possibilisticprogrammingmodelsforactivitynetworkanalysiswithfuzzydurations AT yōngyǎzhù possibilisticprogrammingmodelsforactivitynetworkanalysiswithfuzzydurations AT yungyachu kěnéngxìngguīhuàyúmóhúzhuānànpáichéngzhīyīngyòng AT yōngyǎzhù kěnéngxìngguīhuàyúmóhúzhuānànpáichéngzhīyīngyòng |
_version_ |
1718396393805053952 |