Equipment Capacity Loss Management System For Multi-product Re-entrant Processes
碩士 === 國立清華大學 === 工業工程與工程管理學系 === 95 === Equipment down impacts production capability and produces financial losses. In particular, in semiconductor manufacturing where equipment cost constitutes approximately three quarters of the total manufacturing cost, the ability to estimate the impact of equi...
Main Author: | 呂哲儀 |
---|---|
Other Authors: | D. Daniel Sheu |
Format: | Others |
Language: | zh-TW |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/09864342168226532612 |
Similar Items
-
Equipment Capacity Loss Management For Multi-product Re-entrant Processes
by: Chun-Te Hsiang, et al.
Published: (2008) -
Equipment Capacity Loss Management For Re-entrant Processes
by: Yi-Chin Cho, et al.
Published: (2002) -
A Study on Process Balance for Multi-product Re-entrant Processes
by: Fu, Jun-Rong, et al.
Published: (2009) -
Re-entrant DNA gels
by: Francesca Bomboi, et al.
Published: (2016-10-01) -
Analysis and Design of Process Balance in Re-entrant Factories
by: Jed Chen, et al.
Published: (2006)