Solving Project Scheduling Problem with Variable Activity Intensity by Linear Programming
碩士 === 國立清華大學 === 工業工程與工程管理學系 === 95 === In this study, we consider a resource constrained project scheduling problem with variable activity intensity. In this problem, the resource consumption of an activity is a variable and is proportional to the activity intensity. Based on the theory of Leontie...
Main Author: | 吳俊炘 |
---|---|
Other Authors: | 洪一峯 |
Format: | Others |
Language: | zh-TW |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/49192854531251316812 |
Similar Items
-
Solving Fuzzy Linear Programming Problems with Fuzzy Decision Variables
by: Hsien-Chung Wu
Published: (2019-06-01) -
Solving a mixed-integer linear programming model for a multi-skilled project scheduling problem by simulated annealing
by: H Kazemipoor, et al.
Published: (2012-04-01) -
METHODS FOR SOLVING LINEAR PROGRAMMING PROBLEMS WITH ADDITIONAL RESTRICTIONS TO THE PARTICULAR VARIABLES
by: A. R. Urban
Published: (2015-03-01) -
A mixed integer-linear programming model for solving the hydroelectric unit maintenance scheduling problem
by: Tang, Yuehao
Published: (2011) -
SOLVING PROJECT SCHEDULING PROBLEM WITH DEPENDENT RESOURCE CONSTRAINTS
by: Hsian-Jong Hsiau, et al.
Published: (2011)