The study of crisis management improvement in Taiwan power system contingency accidents which triggered off a big blackout

碩士 === 國立中山大學 === 公共事務管理研究所 === 95 === Due to rising standard of life in Taiwan, power consumption rose dramatically, power systems network are becoming complicated, thus serious impact increasingly. But for many Taipower on-site staffs, lack of blackout related experience and emergency plan. Theref...

Full description

Bibliographic Details
Main Authors: Tai-Chuan Chiu, 邱泰川
Other Authors: Po-Wen Cheng
Format: Others
Language:zh-TW
Published: 2007
Online Access:http://ndltd.ncl.edu.tw/handle/13974235375936954216
id ndltd-TW-095NSYS5636020
record_format oai_dc
spelling ndltd-TW-095NSYS56360202015-10-13T16:56:26Z http://ndltd.ncl.edu.tw/handle/13974235375936954216 The study of crisis management improvement in Taiwan power system contingency accidents which triggered off a big blackout 台電系統偶發事故引起大停電之應變與危機管理改進之研究 Tai-Chuan Chiu 邱泰川 碩士 國立中山大學 公共事務管理研究所 95 Due to rising standard of life in Taiwan, power consumption rose dramatically, power systems network are becoming complicated, thus serious impact increasingly. But for many Taipower on-site staffs, lack of blackout related experience and emergency plan. Therefore it is necessary to understand the weaknesses of Taipower systems and the cause and affect of accidental accidents over the years, to develop blackout emergency plan and minimum the loss. In July 29, 1999, Taiwan had occurred unprecedented collapse of the power transmission system in the midnight, caused the country blackouts, outages four-fifths of users in Taiwan, this was the biggest power rationing during the past 50 years. Then 921 Chichi earthquakes, Chung-Liao substation led to the dumping destroyed, caused more than two weeks of power rationing in northern Taiwan. Such comprehensive blackout in the high-tech industries economic pattern’s country like ours, the losses caused of the economic impact is goes without saying. This Study is base on the “Crisis Management” theory to explore the emergency response while the power outage occurs, and how to deal with the crisis issue. This thesis through data collected, literature review and in-depth interview results, analysis Taipower internal contingency handling mechanism through unpredicted natural disasters or artificial improper operation, intend for Taipower reference to construct a contingency mechanism for unexpected incident which triggered off a blackout accident. Po-Wen Cheng Jih-Hwa Wu 鄭博文 吳濟華 2007 學位論文 ; thesis 150 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中山大學 === 公共事務管理研究所 === 95 === Due to rising standard of life in Taiwan, power consumption rose dramatically, power systems network are becoming complicated, thus serious impact increasingly. But for many Taipower on-site staffs, lack of blackout related experience and emergency plan. Therefore it is necessary to understand the weaknesses of Taipower systems and the cause and affect of accidental accidents over the years, to develop blackout emergency plan and minimum the loss. In July 29, 1999, Taiwan had occurred unprecedented collapse of the power transmission system in the midnight, caused the country blackouts, outages four-fifths of users in Taiwan, this was the biggest power rationing during the past 50 years. Then 921 Chichi earthquakes, Chung-Liao substation led to the dumping destroyed, caused more than two weeks of power rationing in northern Taiwan. Such comprehensive blackout in the high-tech industries economic pattern’s country like ours, the losses caused of the economic impact is goes without saying. This Study is base on the “Crisis Management” theory to explore the emergency response while the power outage occurs, and how to deal with the crisis issue. This thesis through data collected, literature review and in-depth interview results, analysis Taipower internal contingency handling mechanism through unpredicted natural disasters or artificial improper operation, intend for Taipower reference to construct a contingency mechanism for unexpected incident which triggered off a blackout accident.
author2 Po-Wen Cheng
author_facet Po-Wen Cheng
Tai-Chuan Chiu
邱泰川
author Tai-Chuan Chiu
邱泰川
spellingShingle Tai-Chuan Chiu
邱泰川
The study of crisis management improvement in Taiwan power system contingency accidents which triggered off a big blackout
author_sort Tai-Chuan Chiu
title The study of crisis management improvement in Taiwan power system contingency accidents which triggered off a big blackout
title_short The study of crisis management improvement in Taiwan power system contingency accidents which triggered off a big blackout
title_full The study of crisis management improvement in Taiwan power system contingency accidents which triggered off a big blackout
title_fullStr The study of crisis management improvement in Taiwan power system contingency accidents which triggered off a big blackout
title_full_unstemmed The study of crisis management improvement in Taiwan power system contingency accidents which triggered off a big blackout
title_sort study of crisis management improvement in taiwan power system contingency accidents which triggered off a big blackout
publishDate 2007
url http://ndltd.ncl.edu.tw/handle/13974235375936954216
work_keys_str_mv AT taichuanchiu thestudyofcrisismanagementimprovementintaiwanpowersystemcontingencyaccidentswhichtriggeredoffabigblackout
AT qiūtàichuān thestudyofcrisismanagementimprovementintaiwanpowersystemcontingencyaccidentswhichtriggeredoffabigblackout
AT taichuanchiu táidiànxìtǒngǒufāshìgùyǐnqǐdàtíngdiànzhīyīngbiànyǔwēijīguǎnlǐgǎijìnzhīyánjiū
AT qiūtàichuān táidiànxìtǒngǒufāshìgùyǐnqǐdàtíngdiànzhīyīngbiànyǔwēijīguǎnlǐgǎijìnzhīyánjiū
AT taichuanchiu studyofcrisismanagementimprovementintaiwanpowersystemcontingencyaccidentswhichtriggeredoffabigblackout
AT qiūtàichuān studyofcrisismanagementimprovementintaiwanpowersystemcontingencyaccidentswhichtriggeredoffabigblackout
_version_ 1717777917439639552