A study on the CMMI tailoring process: the case of risk management

碩士 === 國立中山大學 === 資訊管理學系研究所 === 95 === The software industry and the information service providers in Taiwan are facing global competition but generally falling behind the international level for their software development ability due to short of capable manpower and lack of software engineering con...

Full description

Bibliographic Details
Main Authors: Chih-Mei Wu, 吳致美
Other Authors: Chin-Fu Ho
Format: Others
Language:zh-TW
Published: 2007
Online Access:http://ndltd.ncl.edu.tw/handle/tbck5e
id ndltd-TW-095NSYS5396032
record_format oai_dc
spelling ndltd-TW-095NSYS53960322019-05-15T20:22:41Z http://ndltd.ncl.edu.tw/handle/tbck5e A study on the CMMI tailoring process: the case of risk management CMMI調適架構之研究:以風險管理為例 Chih-Mei Wu 吳致美 碩士 國立中山大學 資訊管理學系研究所 95 The software industry and the information service providers in Taiwan are facing global competition but generally falling behind the international level for their software development ability due to short of capable manpower and lack of software engineering concept. Moreover, the domestic output value of software is relatively low and the domestic market is also too small; companies are struggling for the market and making profit has become difficult. To solve this issue the Software Engineering Institute (SEI) has developed several combinations of the Capability Maturity Model Integrated (CMMI) in recent years. In this study, theories of implementing CMMI in the software industry are discussed. Taking risk management for a software project as example, we have established the structure and guides of process tailoring for projects of various scales. On the process of risk management, we firstly defined the tailoring aspects according to the CMMI Level 3 implement process, and then interviewed the case study company for their eight plans to analyze and induce the possible tailoring guides. Our findings are as follows. 1. Establishing the risk management strategy (1) Making a risk plan, including activities such as risk definition, analysis, reduction, treatment and monitoring. (2) Providing implement methods, judgment rules, execution thresholds, treatment process, or tools for those activities. (3) Producing necessary output, such as data, records, and documents. (4) Setting up timeframe for risk monitoring or re-evaluation, at least once a month. 2. Establishing the tailoring guides for the process (1) Adjustment and change are allowed, depending on the project property. (2) Feedback is necessary for design and implementation. (3) Concrete and practical methods are necessary; the system is not fully reliable. The research model and structure of this study can be further applied to the newly developed SEI models or other large-scale international standards in the future as a reference for the software organizations to improve their software process. Chin-Fu Ho 侯君溥 2007 學位論文 ; thesis 105 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中山大學 === 資訊管理學系研究所 === 95 === The software industry and the information service providers in Taiwan are facing global competition but generally falling behind the international level for their software development ability due to short of capable manpower and lack of software engineering concept. Moreover, the domestic output value of software is relatively low and the domestic market is also too small; companies are struggling for the market and making profit has become difficult. To solve this issue the Software Engineering Institute (SEI) has developed several combinations of the Capability Maturity Model Integrated (CMMI) in recent years. In this study, theories of implementing CMMI in the software industry are discussed. Taking risk management for a software project as example, we have established the structure and guides of process tailoring for projects of various scales. On the process of risk management, we firstly defined the tailoring aspects according to the CMMI Level 3 implement process, and then interviewed the case study company for their eight plans to analyze and induce the possible tailoring guides. Our findings are as follows. 1. Establishing the risk management strategy (1) Making a risk plan, including activities such as risk definition, analysis, reduction, treatment and monitoring. (2) Providing implement methods, judgment rules, execution thresholds, treatment process, or tools for those activities. (3) Producing necessary output, such as data, records, and documents. (4) Setting up timeframe for risk monitoring or re-evaluation, at least once a month. 2. Establishing the tailoring guides for the process (1) Adjustment and change are allowed, depending on the project property. (2) Feedback is necessary for design and implementation. (3) Concrete and practical methods are necessary; the system is not fully reliable. The research model and structure of this study can be further applied to the newly developed SEI models or other large-scale international standards in the future as a reference for the software organizations to improve their software process.
author2 Chin-Fu Ho
author_facet Chin-Fu Ho
Chih-Mei Wu
吳致美
author Chih-Mei Wu
吳致美
spellingShingle Chih-Mei Wu
吳致美
A study on the CMMI tailoring process: the case of risk management
author_sort Chih-Mei Wu
title A study on the CMMI tailoring process: the case of risk management
title_short A study on the CMMI tailoring process: the case of risk management
title_full A study on the CMMI tailoring process: the case of risk management
title_fullStr A study on the CMMI tailoring process: the case of risk management
title_full_unstemmed A study on the CMMI tailoring process: the case of risk management
title_sort study on the cmmi tailoring process: the case of risk management
publishDate 2007
url http://ndltd.ncl.edu.tw/handle/tbck5e
work_keys_str_mv AT chihmeiwu astudyonthecmmitailoringprocessthecaseofriskmanagement
AT wúzhìměi astudyonthecmmitailoringprocessthecaseofriskmanagement
AT chihmeiwu cmmidiàoshìjiàgòuzhīyánjiūyǐfēngxiǎnguǎnlǐwèilì
AT wúzhìměi cmmidiàoshìjiàgòuzhīyánjiūyǐfēngxiǎnguǎnlǐwèilì
AT chihmeiwu studyonthecmmitailoringprocessthecaseofriskmanagement
AT wúzhìměi studyonthecmmitailoringprocessthecaseofriskmanagement
_version_ 1719098737906679808