A Study on Kaohsuing Metropolitan Mass Rapid Transit System Red and Orange Line Architectural Design Management of Stations and Depots

碩士 === 國立成功大學 === 建築學系專班 === 95 === Since the first subway line occurred in London, U.K. in 1863, having a mass rapid transportation system has been a symbol of modern city over 140 years. Kaohsiung Mass Rapid Transit System started construction in 2001 and many issues of architectural design manage...

Full description

Bibliographic Details
Main Authors: Giang-ying Lu, 呂廣盈
Other Authors: Yao-guang Chen
Format: Others
Language:zh-TW
Published: 2007
Online Access:http://ndltd.ncl.edu.tw/handle/18313117709150881544
id ndltd-TW-095NCKU5222065
record_format oai_dc
spelling ndltd-TW-095NCKU52220652015-10-13T13:59:58Z http://ndltd.ncl.edu.tw/handle/18313117709150881544 A Study on Kaohsuing Metropolitan Mass Rapid Transit System Red and Orange Line Architectural Design Management of Stations and Depots 高雄都會區捷運系統紅橘線路網廠站建築設計管理之研究 Giang-ying Lu 呂廣盈 碩士 國立成功大學 建築學系專班 95 Since the first subway line occurred in London, U.K. in 1863, having a mass rapid transportation system has been a symbol of modern city over 140 years. Kaohsiung Mass Rapid Transit System started construction in 2001 and many issues of architectural design management thus appear and those issues contribute to this study. The major purposes of this study are as below: 1. To interpret the role which the architects can play in the MRT construction from an architectural point of view; For the past twenty years, the experience and resources of Taiwan’s important mass rapid transit constructions were controlled by some big domestic engineering consultant companies. The architects’ participation is limited by the scale and finances of their architect offices. This study intends to, through professional architecture, confer the architects’ role and the future direction of the way the architects can take part in the Mass Rapid Transit constructions. 2. To clarify what kind of position the architectural design management are in the progress and negotiations of the mass rapid transit constructions; The architectural design takes most of the time in the whole constructions. By good architectural design management, it can shorten the working time, promoting the working efficiency and building up the system of architectural design management in the mass rapid transit constructions. 3. To set up a standard of procedure for examining the architectural design management. The conclusions of this research are: 1. The Turn Key system of the Civil and Architecture Detailed Design which includes stations, depots, and building service, needs to have a restricted mechanism of executive strategies. 2. The government needs to supervise the architectural management and execution of the special buildings of the mass rapid transit system in a much more conscientious and careful way. 3. The framework of the team organization should be in order and every crews need to take their own responsibility, not others’and also at the same time. Meanwhile we need to increase the sense of team spirit and reinforce the fellowship in prosperity and adversity. 4. Educating and training the professional architects of mass rapid transit construction and impartation of the experiences is very important. 5. The authorities concerned get involved in the design very much, but on the contrary, it can’t effectively control and manage the construction of the mass rapid transmit system in a very good way. Suggestion: 1. Put the emphasis on the technology transfer of architectural construction and the impartation of the architects’ MRT design experience. 2. The architectural design service fee should be charged in a reasonable range. 3. Value Engineering Analytics should be applied in the detail design services. 4. The Special Building Type Review code needs to define the delayed construction more rigorously and exactly. Yao-guang Chen 陳耀光 2007 學位論文 ; thesis 196 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 建築學系專班 === 95 === Since the first subway line occurred in London, U.K. in 1863, having a mass rapid transportation system has been a symbol of modern city over 140 years. Kaohsiung Mass Rapid Transit System started construction in 2001 and many issues of architectural design management thus appear and those issues contribute to this study. The major purposes of this study are as below: 1. To interpret the role which the architects can play in the MRT construction from an architectural point of view; For the past twenty years, the experience and resources of Taiwan’s important mass rapid transit constructions were controlled by some big domestic engineering consultant companies. The architects’ participation is limited by the scale and finances of their architect offices. This study intends to, through professional architecture, confer the architects’ role and the future direction of the way the architects can take part in the Mass Rapid Transit constructions. 2. To clarify what kind of position the architectural design management are in the progress and negotiations of the mass rapid transit constructions; The architectural design takes most of the time in the whole constructions. By good architectural design management, it can shorten the working time, promoting the working efficiency and building up the system of architectural design management in the mass rapid transit constructions. 3. To set up a standard of procedure for examining the architectural design management. The conclusions of this research are: 1. The Turn Key system of the Civil and Architecture Detailed Design which includes stations, depots, and building service, needs to have a restricted mechanism of executive strategies. 2. The government needs to supervise the architectural management and execution of the special buildings of the mass rapid transit system in a much more conscientious and careful way. 3. The framework of the team organization should be in order and every crews need to take their own responsibility, not others’and also at the same time. Meanwhile we need to increase the sense of team spirit and reinforce the fellowship in prosperity and adversity. 4. Educating and training the professional architects of mass rapid transit construction and impartation of the experiences is very important. 5. The authorities concerned get involved in the design very much, but on the contrary, it can’t effectively control and manage the construction of the mass rapid transmit system in a very good way. Suggestion: 1. Put the emphasis on the technology transfer of architectural construction and the impartation of the architects’ MRT design experience. 2. The architectural design service fee should be charged in a reasonable range. 3. Value Engineering Analytics should be applied in the detail design services. 4. The Special Building Type Review code needs to define the delayed construction more rigorously and exactly.
author2 Yao-guang Chen
author_facet Yao-guang Chen
Giang-ying Lu
呂廣盈
author Giang-ying Lu
呂廣盈
spellingShingle Giang-ying Lu
呂廣盈
A Study on Kaohsuing Metropolitan Mass Rapid Transit System Red and Orange Line Architectural Design Management of Stations and Depots
author_sort Giang-ying Lu
title A Study on Kaohsuing Metropolitan Mass Rapid Transit System Red and Orange Line Architectural Design Management of Stations and Depots
title_short A Study on Kaohsuing Metropolitan Mass Rapid Transit System Red and Orange Line Architectural Design Management of Stations and Depots
title_full A Study on Kaohsuing Metropolitan Mass Rapid Transit System Red and Orange Line Architectural Design Management of Stations and Depots
title_fullStr A Study on Kaohsuing Metropolitan Mass Rapid Transit System Red and Orange Line Architectural Design Management of Stations and Depots
title_full_unstemmed A Study on Kaohsuing Metropolitan Mass Rapid Transit System Red and Orange Line Architectural Design Management of Stations and Depots
title_sort study on kaohsuing metropolitan mass rapid transit system red and orange line architectural design management of stations and depots
publishDate 2007
url http://ndltd.ncl.edu.tw/handle/18313117709150881544
work_keys_str_mv AT giangyinglu astudyonkaohsuingmetropolitanmassrapidtransitsystemredandorangelinearchitecturaldesignmanagementofstationsanddepots
AT lǚguǎngyíng astudyonkaohsuingmetropolitanmassrapidtransitsystemredandorangelinearchitecturaldesignmanagementofstationsanddepots
AT giangyinglu gāoxióngdōuhuìqūjiéyùnxìtǒnghóngjúxiànlùwǎngchǎngzhànjiànzhúshèjìguǎnlǐzhīyánjiū
AT lǚguǎngyíng gāoxióngdōuhuìqūjiéyùnxìtǒnghóngjúxiànlùwǎngchǎngzhànjiànzhúshèjìguǎnlǐzhīyánjiū
AT giangyinglu studyonkaohsuingmetropolitanmassrapidtransitsystemredandorangelinearchitecturaldesignmanagementofstationsanddepots
AT lǚguǎngyíng studyonkaohsuingmetropolitanmassrapidtransitsystemredandorangelinearchitecturaldesignmanagementofstationsanddepots
_version_ 1717747326152343552