Relationship of Quality Measure FTPR and Rework Cost—High-Tech Plant Construction As An Example
碩士 === 國立成功大學 === 土木工程學系專班 === 95 === First time pass ratio (FTPR) is a simple performance measure of construction quality for construction projects. It is the ratio of the first time pass number to total inspection number, for material/equipment before and construction/installation during construct...
Main Authors: | Wen-Tang Tang, 唐文堂 |
---|---|
Other Authors: | Shing-Tao Chang |
Format: | Others |
Language: | zh-TW |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/79347542114490301148 |
Similar Items
-
Quality management and rework in the construction industry
by: Rudolph, John
Published: (2014) -
Rework Quantification and Influence of Rework on Duration and Cost of Equipment Development Task
by: Xilin Zhang, et al.
Published: (2018-10-01) -
Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria
by: Emmanuel Chidiebere Eze, et al.
Published: (2018-01-01) -
Using ANN to Predict the Impact of Communication Factors on the Rework Cost in Construction Projects
by: Roman Trach, et al.
Published: (2021-07-01) -
Cost information requirements for managing aircraft rework
by: Faust, David P., et al.
Published: (2012)