Building Capacity Information System in Enterprise Resource Planning

碩士 === 國立高雄應用科技大學 === 工業工程與管理系碩士班 === 95 === The short and medium production planning usually find the shortage of capacity after arranging master schedule in the enterprise resource planning system. This will yields to rearrange the original master schedule. This research develops a checking capaci...

Full description

Bibliographic Details
Main Authors: Hsiao-Chiao Chen, 陳小喬
Other Authors: Fu-Tsao Chih
Format: Others
Language:zh-TW
Published: 2007
Online Access:http://ndltd.ncl.edu.tw/handle/34075794684103875367
id ndltd-TW-095KUAS0041002
record_format oai_dc
spelling ndltd-TW-095KUAS00410022016-05-25T04:14:04Z http://ndltd.ncl.edu.tw/handle/34075794684103875367 Building Capacity Information System in Enterprise Resource Planning 企業資源規劃之產能負荷資訊系統建立 Hsiao-Chiao Chen 陳小喬 碩士 國立高雄應用科技大學 工業工程與管理系碩士班 95 The short and medium production planning usually find the shortage of capacity after arranging master schedule in the enterprise resource planning system. This will yields to rearrange the original master schedule. This research develops a checking capacity information system based on real time after receiving the customer order. After finding the shortage of inventories, the system can compute the loading of bottleneck equipment and the human resources. Before arranging master schedule, the loading of the all resources provides a reference for decision maker to make a decision of outsourcing or manufacturing. This may reduce the waste of rearranging master schedule, satisfy the customer’s due date, and prevent the goodwill loss. Fu-Tsao Chih Ying-Fang Huang 池福灶 黃營芳 2007 學位論文 ; thesis 55 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄應用科技大學 === 工業工程與管理系碩士班 === 95 === The short and medium production planning usually find the shortage of capacity after arranging master schedule in the enterprise resource planning system. This will yields to rearrange the original master schedule. This research develops a checking capacity information system based on real time after receiving the customer order. After finding the shortage of inventories, the system can compute the loading of bottleneck equipment and the human resources. Before arranging master schedule, the loading of the all resources provides a reference for decision maker to make a decision of outsourcing or manufacturing. This may reduce the waste of rearranging master schedule, satisfy the customer’s due date, and prevent the goodwill loss.
author2 Fu-Tsao Chih
author_facet Fu-Tsao Chih
Hsiao-Chiao Chen
陳小喬
author Hsiao-Chiao Chen
陳小喬
spellingShingle Hsiao-Chiao Chen
陳小喬
Building Capacity Information System in Enterprise Resource Planning
author_sort Hsiao-Chiao Chen
title Building Capacity Information System in Enterprise Resource Planning
title_short Building Capacity Information System in Enterprise Resource Planning
title_full Building Capacity Information System in Enterprise Resource Planning
title_fullStr Building Capacity Information System in Enterprise Resource Planning
title_full_unstemmed Building Capacity Information System in Enterprise Resource Planning
title_sort building capacity information system in enterprise resource planning
publishDate 2007
url http://ndltd.ncl.edu.tw/handle/34075794684103875367
work_keys_str_mv AT hsiaochiaochen buildingcapacityinformationsysteminenterpriseresourceplanning
AT chénxiǎoqiáo buildingcapacityinformationsysteminenterpriseresourceplanning
AT hsiaochiaochen qǐyèzīyuánguīhuàzhīchǎnnéngfùhézīxùnxìtǒngjiànlì
AT chénxiǎoqiáo qǐyèzīyuánguīhuàzhīchǎnnéngfùhézīxùnxìtǒngjiànlì
_version_ 1718279823095234560