The development of an integrated performance measurement and evaluation framework for the new product system installation

碩士 === 開南大學 === 企業管理學系碩士班 === 95 === Abstract In this highly competitive globalization, the project manager not only deals with the functions of project management that include scope, organization, quality, cost, schedule; but also faces the problems brought by the actual daily practices such as “h...

Full description

Bibliographic Details
Main Authors: Yi-Fu Hsu, 許倚福
Other Authors: Kuang-Chung Huang
Format: Others
Language:zh-TW
Published: 2007
Online Access:http://ndltd.ncl.edu.tw/handle/15189492059289941475
id ndltd-TW-095KNU00121032
record_format oai_dc
spelling ndltd-TW-095KNU001210322015-10-13T16:41:42Z http://ndltd.ncl.edu.tw/handle/15189492059289941475 The development of an integrated performance measurement and evaluation framework for the new product system installation 整合型專案管理績效評量模式之研究 Yi-Fu Hsu 許倚福 碩士 開南大學 企業管理學系碩士班 95 Abstract In this highly competitive globalization, the project manager not only deals with the functions of project management that include scope, organization, quality, cost, schedule; but also faces the problems brought by the actual daily practices such as “how to guarantee the punctual delivery of machine equipments from overseas”, “how to avoid the situation of overtime by the subcontractor due to ineffective manpower allocation” and “how to attend to customer dissatisfaction due to the work delay” among others. In addition, the project planning and execution are filled with uncertainties because of language and culture conflicts. This study is focused on the non-financial performance indicators and is based on the research findings and practices. It classifies seven critical success factors influencing the success of projects: customer satisfaction, project manager personality, material examination control, customer coordination with project execution, outsourcing project management capability, outsourcing logistics capability, bargaining power with customer and contractor. Based on the identified critical factors, a Learning by Doing Framework of project management is proposed which is used an index for evaluating the project achievement. With the ongoing data feedback, evaluation, analysis, early detected problems, solutions are presented. The paper includes findings of a case study showing how the model was used to improve the performance of a project. Kuang-Chung Huang 黃光中 2007 學位論文 ; thesis 115 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 開南大學 === 企業管理學系碩士班 === 95 === Abstract In this highly competitive globalization, the project manager not only deals with the functions of project management that include scope, organization, quality, cost, schedule; but also faces the problems brought by the actual daily practices such as “how to guarantee the punctual delivery of machine equipments from overseas”, “how to avoid the situation of overtime by the subcontractor due to ineffective manpower allocation” and “how to attend to customer dissatisfaction due to the work delay” among others. In addition, the project planning and execution are filled with uncertainties because of language and culture conflicts. This study is focused on the non-financial performance indicators and is based on the research findings and practices. It classifies seven critical success factors influencing the success of projects: customer satisfaction, project manager personality, material examination control, customer coordination with project execution, outsourcing project management capability, outsourcing logistics capability, bargaining power with customer and contractor. Based on the identified critical factors, a Learning by Doing Framework of project management is proposed which is used an index for evaluating the project achievement. With the ongoing data feedback, evaluation, analysis, early detected problems, solutions are presented. The paper includes findings of a case study showing how the model was used to improve the performance of a project.
author2 Kuang-Chung Huang
author_facet Kuang-Chung Huang
Yi-Fu Hsu
許倚福
author Yi-Fu Hsu
許倚福
spellingShingle Yi-Fu Hsu
許倚福
The development of an integrated performance measurement and evaluation framework for the new product system installation
author_sort Yi-Fu Hsu
title The development of an integrated performance measurement and evaluation framework for the new product system installation
title_short The development of an integrated performance measurement and evaluation framework for the new product system installation
title_full The development of an integrated performance measurement and evaluation framework for the new product system installation
title_fullStr The development of an integrated performance measurement and evaluation framework for the new product system installation
title_full_unstemmed The development of an integrated performance measurement and evaluation framework for the new product system installation
title_sort development of an integrated performance measurement and evaluation framework for the new product system installation
publishDate 2007
url http://ndltd.ncl.edu.tw/handle/15189492059289941475
work_keys_str_mv AT yifuhsu thedevelopmentofanintegratedperformancemeasurementandevaluationframeworkforthenewproductsysteminstallation
AT xǔyǐfú thedevelopmentofanintegratedperformancemeasurementandevaluationframeworkforthenewproductsysteminstallation
AT yifuhsu zhěnghéxíngzhuānànguǎnlǐjīxiàopíngliàngmóshìzhīyánjiū
AT xǔyǐfú zhěnghéxíngzhuānànguǎnlǐjīxiàopíngliàngmóshìzhīyánjiū
AT yifuhsu developmentofanintegratedperformancemeasurementandevaluationframeworkforthenewproductsysteminstallation
AT xǔyǐfú developmentofanintegratedperformancemeasurementandevaluationframeworkforthenewproductsysteminstallation
_version_ 1717773694834573312