On Flow Shop with Multiprocessors Scheduling with Due Windows
碩士 === 輔仁大學 === 管理學研究所 === 95 === Conventional flow shop scheduling can be only applied to multi-stage, single machine operating mode. With globalization, parallel machine operating mode can be adopted to increase the utility rate of condition, decrease inventory and delivery on time. With the manag...
Main Authors: | Chen Mei Lin, 陳梅鈴 |
---|---|
Other Authors: | Huang Rong-Hwa |
Format: | Others |
Language: | zh-TW |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/86809463012046761263 |
Similar Items
-
no-wait two-stage multiprocessor flow shop scheduling with time window and unit setup
by: Hung-Yu Cheng, et al.
Published: (2009) -
Reentrant flexible flow shop scheduling with due windows
by: Guo, Chen-Wei, et al.
Published: (2011) -
No-Wait Flexible Flow Shop Scheduling with Due Windows
by: Rong-Hwa Huang, et al.
Published: (2015-01-01) -
Production Scheduling with Due Windows- Flow Shop and Job Shop Cases
by: Yu Shun Chi, et al.
Published: (2014) -
Two-stage multiprocessor flow shop scheduling with deteriorating maintenance.
by: Lee, Huitsung, et al.
Published: (2011)