Single-machine scheduling problem with stepwise deteriorating jobs
碩士 === 逢甲大學 === 統計與精算所 === 95 === In many real situations, it is found that if certain maintenance procedures fail to be completed prior to a pre-specified deteriorating date, then the jobs will require extra time for successful completion. In this thesis, a single-machine total completion time prob...
Main Authors: | Chia-Chi He, 何嘉綺 |
---|---|
Other Authors: | Wen-Chiung Lee |
Format: | Others |
Language: | en_US |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/70055140730758225200 |
Similar Items
-
A single-machine deteriorating job scheduling problem with release times
by: Yu-Hsiang Chung, et al.
Published: (2007) -
A fuzzy modeling for single machine scheduling problem with deteriorating jobs
by: Mohammad Mahavi Mazdeh, et al.
Published: (2010-06-01) -
Single-Machine Scheduling with Job Rejection, Deteriorating Effects, and Deteriorating Maintenance Activities
by: Haiwei Nian, et al.
Published: (2013-01-01) -
A single-machine scheduling problem to minimize the maximum tardiness with deteriorating jobs and setup times
by: Yi-Chi Huang, et al.
Published: (2010) -
Unrelated parallel-machine scheduling with deteriorating jobs and rejection
by: Chia-Wen Chang, et al.
Published: (2014)