Cost Effectiveness Analysis on a Vehicle Dispatching Problem: A Case Study of Ready Mixed Concrete Industry

碩士 === 大葉大學 === 工業工程與科技管理學系 === 95 === Ready Mixed Concrete (RMC) plays the important role in the construction industry; because it is one of the most widely used and highly demanded material in the construction industry. Form the construction site perspective; they expect the operations of the cast...

Full description

Bibliographic Details
Main Authors: Ya-Zhu Xiao, 蕭雅竹
Other Authors: Chuang-Chun Chiou
Format: Others
Language:zh-TW
Published: 2007
Online Access:http://ndltd.ncl.edu.tw/handle/00767518521570686848
id ndltd-TW-095DYU00030034
record_format oai_dc
spelling ndltd-TW-095DYU000300342015-10-13T16:45:43Z http://ndltd.ncl.edu.tw/handle/00767518521570686848 Cost Effectiveness Analysis on a Vehicle Dispatching Problem: A Case Study of Ready Mixed Concrete Industry 派車排程問題之成本效益分析-以預拌混凝土廠為例 Ya-Zhu Xiao 蕭雅竹 碩士 大葉大學 工業工程與科技管理學系 95 Ready Mixed Concrete (RMC) plays the important role in the construction industry; because it is one of the most widely used and highly demanded material in the construction industry. Form the construction site perspective; they expect the operations of the casting concrete without interruption. Another perspective from the RMC firms when many delivering requests from various construction sites arriving at the same time, they try to maximize the plant’s profits. Under this condition, the RMC firm must completes all of the RMC batch plant to prevent any delay for the the next coming period of orders. In this research, we find the dispatching schedule which minimizes the total flow time at construction sites and satisfy the requests from various construction sites. First, a model of dispatching RMC trucks based on the operation of the RMC industry is constructed. Then, we propose Genetic Algorithms (GA) and fast messy Genetic Algorithm (fmGA) to get a near optimal solution in a reasonable computation time. Finally, we address the relation between the orders and the number of trucks for fulfilling the demand from each sites and analyze the effectiveness analysis o investment on purchasing additional trucks. The experimental results can facilitate manager’s to sequence the concrete arrangements delivery to achieve a more cost-effective scheduling. Chuang-Chun Chiou 邱創鈞 2007 學位論文 ; thesis 77 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 大葉大學 === 工業工程與科技管理學系 === 95 === Ready Mixed Concrete (RMC) plays the important role in the construction industry; because it is one of the most widely used and highly demanded material in the construction industry. Form the construction site perspective; they expect the operations of the casting concrete without interruption. Another perspective from the RMC firms when many delivering requests from various construction sites arriving at the same time, they try to maximize the plant’s profits. Under this condition, the RMC firm must completes all of the RMC batch plant to prevent any delay for the the next coming period of orders. In this research, we find the dispatching schedule which minimizes the total flow time at construction sites and satisfy the requests from various construction sites. First, a model of dispatching RMC trucks based on the operation of the RMC industry is constructed. Then, we propose Genetic Algorithms (GA) and fast messy Genetic Algorithm (fmGA) to get a near optimal solution in a reasonable computation time. Finally, we address the relation between the orders and the number of trucks for fulfilling the demand from each sites and analyze the effectiveness analysis o investment on purchasing additional trucks. The experimental results can facilitate manager’s to sequence the concrete arrangements delivery to achieve a more cost-effective scheduling.
author2 Chuang-Chun Chiou
author_facet Chuang-Chun Chiou
Ya-Zhu Xiao
蕭雅竹
author Ya-Zhu Xiao
蕭雅竹
spellingShingle Ya-Zhu Xiao
蕭雅竹
Cost Effectiveness Analysis on a Vehicle Dispatching Problem: A Case Study of Ready Mixed Concrete Industry
author_sort Ya-Zhu Xiao
title Cost Effectiveness Analysis on a Vehicle Dispatching Problem: A Case Study of Ready Mixed Concrete Industry
title_short Cost Effectiveness Analysis on a Vehicle Dispatching Problem: A Case Study of Ready Mixed Concrete Industry
title_full Cost Effectiveness Analysis on a Vehicle Dispatching Problem: A Case Study of Ready Mixed Concrete Industry
title_fullStr Cost Effectiveness Analysis on a Vehicle Dispatching Problem: A Case Study of Ready Mixed Concrete Industry
title_full_unstemmed Cost Effectiveness Analysis on a Vehicle Dispatching Problem: A Case Study of Ready Mixed Concrete Industry
title_sort cost effectiveness analysis on a vehicle dispatching problem: a case study of ready mixed concrete industry
publishDate 2007
url http://ndltd.ncl.edu.tw/handle/00767518521570686848
work_keys_str_mv AT yazhuxiao costeffectivenessanalysisonavehicledispatchingproblemacasestudyofreadymixedconcreteindustry
AT xiāoyǎzhú costeffectivenessanalysisonavehicledispatchingproblemacasestudyofreadymixedconcreteindustry
AT yazhuxiao pàichēpáichéngwèntízhīchéngběnxiàoyìfēnxīyǐyùbànhùnníngtǔchǎngwèilì
AT xiāoyǎzhú pàichēpáichéngwèntízhīchéngběnxiàoyìfēnxīyǐyùbànhùnníngtǔchǎngwèilì
_version_ 1717774195000082432