Developing a Computer Simulation System for River Embankment Construction Projects
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 95 === Taiwan Government spends great amount of money to build, repair or rehabilitate, and maintain river embankment every year. For instance, there were 234,560-meter-long and 45,242-meter-long river bank new built and rehabilitated in 2004, respectively. Due to the...
Main Authors: | Tsung-Ju Lin, 林宗儒 |
---|---|
Other Authors: | Tao - Ming Cheng |
Format: | Others |
Language: | zh-TW |
Published: |
2007
|
Online Access: | http://ndltd.ncl.edu.tw/handle/53155757390928607390 |
Similar Items
-
Carbon Emission Estimation Using Construction Activity Portfolio for River Embankment Construction Projects
by: Chih-Hao Fan, et al.
Published: (2016) -
Reducing Flood Risk using Computer System for Monitoring River Embankments
by: Chuchro Monika, et al.
Published: (2017-09-01) -
Inundation risk for embanked rivers
by: W. G. Strupczewski, et al.
Published: (2013-08-01) -
Lateral loading on piles due to simulated embankment construction
by: Springman, Sarah Marcella
Published: (1989) -
Methodical Approaches to the Development of Embankment Arrangement Projects
by: Danilchenko Vadim, et al.
Published: (2019-01-01)