Application of Simulated Annealing for IC Assemble House with Scheduling of Molding Process
碩士 === 國立臺北科技大學 === 工業工程與管理系所 === 94 === The complexity of scheduling problems and the variety of manufacturing systems make industrial scheduling become a difficult problem. Using mathematical models such as linear programming to solve optimal scheduling problems are typical NP-hard problems. There...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2006
|
Online Access: | http://ndltd.ncl.edu.tw/handle/ntmhr9 |