Study of the Level Detail of Preliminary Design For Design-Build Contract
碩士 === 國立臺灣科技大學 === 營建工程系 === 94 === It is a world tendency that the procurement of public works adopt the Design-Build mode in substitute for the traditional engineering design-bid-build, especially after the promulgate of 「government procurement」and「DB implementation means」, which enable the DB pr...
Main Authors: | Kuo-Jeng Rau, 饒國政 |
---|---|
Other Authors: | Sou-Sen Leu |
Format: | Others |
Language: | zh-TW |
Published: |
2006
|
Online Access: | http://ndltd.ncl.edu.tw/handle/57650353008941660351 |
Similar Items
-
A study of risk allocation in Design-build & EPC contract
by: Jao, Meng-Hao, et al.
Published: (2018) -
Using a Digital Computer for Preliminary Design of Buildings : An Assessment with Industrial Cooperation of Measures and Levels of Detail
by: Fuller, R. S.
Published: (1976) -
Combined preliminary–detailed design of wind turbines
by: P. Bortolotti, et al.
Published: (2016-05-01) -
The owner's level of effort in design-build contracts.
by: Fetters, Damon Scott.
Published: (2012) -
The planning and management of detailed building design
by: Newton, Andrew John
Published: (1995)