Establishment of Communication Management Model for Planning & Design Project

碩士 === 國立臺灣科技大學 === 營建工程系 === 94 === There are quite a lot of authorities involved in impetus and implementation of public construction, and effects of communication and coordination deeply influence construction result. In construction life cycle, it is mostly influenced during planning design sta...

Full description

Bibliographic Details
Main Authors: Chang-Ai Hsia, 章艾霞
Other Authors: Lin-YongHuang
Format: Others
Language:zh-TW
Published: 2006
Online Access:http://ndltd.ncl.edu.tw/handle/c7m9t8
id ndltd-TW-094NTUS5512065
record_format oai_dc
spelling ndltd-TW-094NTUS55120652019-05-15T19:18:15Z http://ndltd.ncl.edu.tw/handle/c7m9t8 Establishment of Communication Management Model for Planning & Design Project 規劃設計專案溝通管理模式建構之研究 Chang-Ai Hsia 章艾霞 碩士 國立臺灣科技大學 營建工程系 94 There are quite a lot of authorities involved in impetus and implementation of public construction, and effects of communication and coordination deeply influence construction result. In construction life cycle, it is mostly influenced during planning design stage. As long as communication management can be effectively carried out during planning design stage, situations occurred during follow-up stages including frequent design modification, interface coordination failures, construction defaults…etc. can be largely reduced. In view of above, this study is for the purpose of controlling the points of communication conflict sources and management resulting from each stage of planning design project performed by local engineering consultants companies by means of interviews with professionals and studies of respective case so as to establish a suite of communication management model applicable to planning design projects of local engineering companies. The six processes as follows are comprised in this model: 1.Advance Work 2.Communication Planning 3.Information Transmission/Distribution Implementation 4.Performance Reporting 5.Design Result Presentation and Feedback 6.Stakeholders Management. Simultaneously, this study is also to plan measures of communication management for each process in cooperation with planning design operation procedure. It is expected to coordinate the problems arisen from each interface in implementation and integration of Planning & Design project by means of establishment and development of the model, to carry out thoroughly the control of progress, cost estimate and quality, and to make Planning & Design project management more efficient and methodical so as to ensure the accomplishment of objective for project management. Lin-YongHuang, 林耀煌 2006 學位論文 ; thesis 125 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣科技大學 === 營建工程系 === 94 === There are quite a lot of authorities involved in impetus and implementation of public construction, and effects of communication and coordination deeply influence construction result. In construction life cycle, it is mostly influenced during planning design stage. As long as communication management can be effectively carried out during planning design stage, situations occurred during follow-up stages including frequent design modification, interface coordination failures, construction defaults…etc. can be largely reduced. In view of above, this study is for the purpose of controlling the points of communication conflict sources and management resulting from each stage of planning design project performed by local engineering consultants companies by means of interviews with professionals and studies of respective case so as to establish a suite of communication management model applicable to planning design projects of local engineering companies. The six processes as follows are comprised in this model: 1.Advance Work 2.Communication Planning 3.Information Transmission/Distribution Implementation 4.Performance Reporting 5.Design Result Presentation and Feedback 6.Stakeholders Management. Simultaneously, this study is also to plan measures of communication management for each process in cooperation with planning design operation procedure. It is expected to coordinate the problems arisen from each interface in implementation and integration of Planning & Design project by means of establishment and development of the model, to carry out thoroughly the control of progress, cost estimate and quality, and to make Planning & Design project management more efficient and methodical so as to ensure the accomplishment of objective for project management.
author2 Lin-YongHuang,
author_facet Lin-YongHuang,
Chang-Ai Hsia
章艾霞
author Chang-Ai Hsia
章艾霞
spellingShingle Chang-Ai Hsia
章艾霞
Establishment of Communication Management Model for Planning & Design Project
author_sort Chang-Ai Hsia
title Establishment of Communication Management Model for Planning & Design Project
title_short Establishment of Communication Management Model for Planning & Design Project
title_full Establishment of Communication Management Model for Planning & Design Project
title_fullStr Establishment of Communication Management Model for Planning & Design Project
title_full_unstemmed Establishment of Communication Management Model for Planning & Design Project
title_sort establishment of communication management model for planning & design project
publishDate 2006
url http://ndltd.ncl.edu.tw/handle/c7m9t8
work_keys_str_mv AT changaihsia establishmentofcommunicationmanagementmodelforplanningdesignproject
AT zhāngàixiá establishmentofcommunicationmanagementmodelforplanningdesignproject
AT changaihsia guīhuàshèjìzhuānàngōutōngguǎnlǐmóshìjiàngòuzhīyánjiū
AT zhāngàixiá guīhuàshèjìzhuānàngōutōngguǎnlǐmóshìjiàngòuzhīyánjiū
_version_ 1719087460571414528