Factor Analysis of the Schedule of Design-Build Construction-An Example of Architectural Construction
碩士 === 國立臺灣大學 === 土木工程學研究所 === 94 === Abstract Several advantages and the efficiency of Design-Build construction have been confirmed by the academia, administration and enterprise. There is a tendency that this construction procurement model will be the main stream in our country gradually. I...
Main Authors: | Kun-Tien Lin, 林坤田 |
---|---|
Other Authors: | 曾惠斌 |
Format: | Others |
Language: | zh-TW |
Published: |
2006
|
Online Access: | http://ndltd.ncl.edu.tw/handle/68379142341118827069 |
Similar Items
- Schedule Risk Analysis of Design-Build Highway Construction Projects
-
Research on Design Quality Management for Building Construction
by: Kun-long Tsai, et al.
Published: (2008) -
The Study of Schedule Risk for Urban Design Review in Design-Build Building Construction
by: Pai-Ling Wu, et al.
Published: (2007) -
Development of a Knowledge Map for Construction Scheduling
by: Kun-Hong Wu, et al.
Published: (2005) -
Factors Affecting Construction Schedule in Turnkey Project –An Example of Kaohsiung Light Rail Project
by: LIN,CHING-ERH, et al.
Published: (2016)