Factor Analysis of the Schedule of Design-Build Construction-An Example of Architectural Construction

碩士 === 國立臺灣大學 === 土木工程學研究所 === 94 === Abstract Several advantages and the efficiency of Design-Build construction have been confirmed by the academia, administration and enterprise. There is a tendency that this construction procurement model will be the main stream in our country gradually.   I...

Full description

Bibliographic Details
Main Authors: Kun-Tien Lin, 林坤田
Other Authors: 曾惠斌
Format: Others
Language:zh-TW
Published: 2006
Online Access:http://ndltd.ncl.edu.tw/handle/68379142341118827069
id ndltd-TW-094NTU05015069
record_format oai_dc
spelling ndltd-TW-094NTU050150692015-12-16T04:38:21Z http://ndltd.ncl.edu.tw/handle/68379142341118827069 Factor Analysis of the Schedule of Design-Build Construction-An Example of Architectural Construction 統包工程進度之因素分析-以建築工程為例 Kun-Tien Lin 林坤田 碩士 國立臺灣大學 土木工程學研究所 94 Abstract Several advantages and the efficiency of Design-Build construction have been confirmed by the academia, administration and enterprise. There is a tendency that this construction procurement model will be the main stream in our country gradually.   In recent years, lots of literatures related to Design-Build construction were published in Taiwan. Nevertheless, most of them were written from the viewpoint of owner. In fact, the liability of construction execution is primarily depended on the contractor and only few materials about this concern could be referred. For this reason, we would like to investigate the key factor affecting the schedule of Design-Build construction from the viewpoint of contractor in this thesis. Design-Build architectural constructions are more complex than other kind of Design-Build constructions, since there are more materials, working steps and complication of work interfaces. This thesis focuses on Design-Build architectural constructions and hope that it can be employed in all Design-Build constructions.   The contents of the work items in this thesis are on the basis of the reference book “Quality and Schedule Management of Design-Build Constructions” edited by Public Construction Commission, Executive Yuan. In addition, we have added some work items such as milestone in the thesis; hoping the framework would be more complete so it is more convenient for people to carry out construction schedule control. The questionnaires included in this thesis are based on the factor phase of Design-Build schedule control. Besides, we use AHP (Analysis Hierarchy Process)and ranking method to perform statistical analysis so that we can get the relative weight or sequence of the key factors in Design-Build construction schedule control. All of the results could be offered as engineer’s reference and might be employed in engineering implementation; with lowest risks and cost-effective management engineers can achieve the duration and quality control of the constructions as expected. 曾惠斌 2006 學位論文 ; thesis 106 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣大學 === 土木工程學研究所 === 94 === Abstract Several advantages and the efficiency of Design-Build construction have been confirmed by the academia, administration and enterprise. There is a tendency that this construction procurement model will be the main stream in our country gradually.   In recent years, lots of literatures related to Design-Build construction were published in Taiwan. Nevertheless, most of them were written from the viewpoint of owner. In fact, the liability of construction execution is primarily depended on the contractor and only few materials about this concern could be referred. For this reason, we would like to investigate the key factor affecting the schedule of Design-Build construction from the viewpoint of contractor in this thesis. Design-Build architectural constructions are more complex than other kind of Design-Build constructions, since there are more materials, working steps and complication of work interfaces. This thesis focuses on Design-Build architectural constructions and hope that it can be employed in all Design-Build constructions.   The contents of the work items in this thesis are on the basis of the reference book “Quality and Schedule Management of Design-Build Constructions” edited by Public Construction Commission, Executive Yuan. In addition, we have added some work items such as milestone in the thesis; hoping the framework would be more complete so it is more convenient for people to carry out construction schedule control. The questionnaires included in this thesis are based on the factor phase of Design-Build schedule control. Besides, we use AHP (Analysis Hierarchy Process)and ranking method to perform statistical analysis so that we can get the relative weight or sequence of the key factors in Design-Build construction schedule control. All of the results could be offered as engineer’s reference and might be employed in engineering implementation; with lowest risks and cost-effective management engineers can achieve the duration and quality control of the constructions as expected.
author2 曾惠斌
author_facet 曾惠斌
Kun-Tien Lin
林坤田
author Kun-Tien Lin
林坤田
spellingShingle Kun-Tien Lin
林坤田
Factor Analysis of the Schedule of Design-Build Construction-An Example of Architectural Construction
author_sort Kun-Tien Lin
title Factor Analysis of the Schedule of Design-Build Construction-An Example of Architectural Construction
title_short Factor Analysis of the Schedule of Design-Build Construction-An Example of Architectural Construction
title_full Factor Analysis of the Schedule of Design-Build Construction-An Example of Architectural Construction
title_fullStr Factor Analysis of the Schedule of Design-Build Construction-An Example of Architectural Construction
title_full_unstemmed Factor Analysis of the Schedule of Design-Build Construction-An Example of Architectural Construction
title_sort factor analysis of the schedule of design-build construction-an example of architectural construction
publishDate 2006
url http://ndltd.ncl.edu.tw/handle/68379142341118827069
work_keys_str_mv AT kuntienlin factoranalysisofthescheduleofdesignbuildconstructionanexampleofarchitecturalconstruction
AT línkūntián factoranalysisofthescheduleofdesignbuildconstructionanexampleofarchitecturalconstruction
AT kuntienlin tǒngbāogōngchéngjìndùzhīyīnsùfēnxīyǐjiànzhúgōngchéngwèilì
AT línkūntián tǒngbāogōngchéngjìndùzhīyīnsùfēnxīyǐjiànzhúgōngchéngwèilì
_version_ 1718149490777522176