Studies on the lining inspection and corresponding maintenance of rock tunnels, examples of those located in north-link railway
碩士 === 國立臺灣海洋大學 === 河海工程學系 === 94 === Abstract The designed life-spans of civil structures are 50 to 100 years usually. During operating the design conditions may be changed because of the geological activities, groundwater leakage or erosion, time-dependent properties of supporting material, etc....
Main Authors: | Liu,shih-Lin, 劉世琳 |
---|---|
Other Authors: | Chern,chuh-Jih |
Format: | Others |
Language: | zh-TW |
Published: |
2006
|
Online Access: | http://ndltd.ncl.edu.tw/handle/17265538361058338474 |
Similar Items
-
Innovative methodology for railway tunnel inspection
by: Behzad Vasheghani Farahani
Published: (2019) -
Study on the Inspection and Safety Assessment of the Railway Tunnel
by: Jui-Wen Yu, et al.
Published: (2008) -
Cultural Factors in On-line Inspection of Aviation Maintenance
by: Shih-Hao Su, et al.
Published: (2007) -
Automated Inspection of Railway Tunnels’ Power Line Using LiDAR Point Clouds
by: Ana Sánchez-Rodríguez, et al.
Published: (2019-11-01) -
Lining Crack Patterns Corresponding with 3D Displacements for Rock Tunnels in Operation Revealed by Numerical Simulation
by: Shih-Ting Huang, et al.
Published: (2016)