Improving the Performance of Equipment Design Development through Sub-Processes

碩士 === 國立成功大學 === 工學院工程管理專班 === 94 ===  The design development project management of the equipment is usually a series of important activities that are organized and tightly connected. Therefore, when facing rapid changes and competitive situations, the design development process should not only ta...

Full description

Bibliographic Details
Main Authors: Ming-Liang Lee, 李明良
Other Authors: Shing-Tao Chang
Format: Others
Language:zh-TW
Published: 2006
Online Access:http://ndltd.ncl.edu.tw/handle/64585735804811967818
id ndltd-TW-094NCKU5031004
record_format oai_dc
spelling ndltd-TW-094NCKU50310042016-05-30T04:21:45Z http://ndltd.ncl.edu.tw/handle/64585735804811967818 Improving the Performance of Equipment Design Development through Sub-Processes 以次流程改進設備設計開發的績效 Ming-Liang Lee 李明良 碩士 國立成功大學 工學院工程管理專班 94  The design development project management of the equipment is usually a series of important activities that are organized and tightly connected. Therefore, when facing rapid changes and competitive situations, the design development process should not only take the technical aspect into consideration, but also react effectively to different equipment situations.  The production equipment provides production capability. The good or bad of the production capability is affected by the production equipment; and the good or bad of the development is based on the quality of the equipment development process.  In order to understand the impact of the equipment development process to the equipment development, this study from a case working unit has taken representative Cutting Machine equipment development cases on the last three years (2002-2004) and aimed at the problems occured the typical development process.  The sub-process concept is provided as the solution model. Besides, it has found the solution for the developed typical process problem under such mode. Such solution is divided into integrated and stage-based aspects. On the integrated aspect, it has built the customer-made sub- process, set up certain equipment design and development manual, and increased the technical and the management information. On the stage-based aspect, it has offered the improvement means to the problems occurred from plan, design, purchase, assembly, test, and completion of the six stages.  Finally, the efficiency of the sub-process is checked through interviews. The initial interview makes sure whether the main idea of the sub-process is recognized. And the in-depth interview makes sure whether the improvement method of the typical process is effective and to estimate its efficiency.  The investigation on equipment design development process has not been seen in the domestic documents. However, it is found during the interview that the practitioners have the intention to upgrade the development ability through the improvement of equipment development sub-processes. Shing-Tao Chang 張行道 2006 學位論文 ; thesis 102 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 工學院工程管理專班 === 94 ===  The design development project management of the equipment is usually a series of important activities that are organized and tightly connected. Therefore, when facing rapid changes and competitive situations, the design development process should not only take the technical aspect into consideration, but also react effectively to different equipment situations.  The production equipment provides production capability. The good or bad of the production capability is affected by the production equipment; and the good or bad of the development is based on the quality of the equipment development process.  In order to understand the impact of the equipment development process to the equipment development, this study from a case working unit has taken representative Cutting Machine equipment development cases on the last three years (2002-2004) and aimed at the problems occured the typical development process.  The sub-process concept is provided as the solution model. Besides, it has found the solution for the developed typical process problem under such mode. Such solution is divided into integrated and stage-based aspects. On the integrated aspect, it has built the customer-made sub- process, set up certain equipment design and development manual, and increased the technical and the management information. On the stage-based aspect, it has offered the improvement means to the problems occurred from plan, design, purchase, assembly, test, and completion of the six stages.  Finally, the efficiency of the sub-process is checked through interviews. The initial interview makes sure whether the main idea of the sub-process is recognized. And the in-depth interview makes sure whether the improvement method of the typical process is effective and to estimate its efficiency.  The investigation on equipment design development process has not been seen in the domestic documents. However, it is found during the interview that the practitioners have the intention to upgrade the development ability through the improvement of equipment development sub-processes.
author2 Shing-Tao Chang
author_facet Shing-Tao Chang
Ming-Liang Lee
李明良
author Ming-Liang Lee
李明良
spellingShingle Ming-Liang Lee
李明良
Improving the Performance of Equipment Design Development through Sub-Processes
author_sort Ming-Liang Lee
title Improving the Performance of Equipment Design Development through Sub-Processes
title_short Improving the Performance of Equipment Design Development through Sub-Processes
title_full Improving the Performance of Equipment Design Development through Sub-Processes
title_fullStr Improving the Performance of Equipment Design Development through Sub-Processes
title_full_unstemmed Improving the Performance of Equipment Design Development through Sub-Processes
title_sort improving the performance of equipment design development through sub-processes
publishDate 2006
url http://ndltd.ncl.edu.tw/handle/64585735804811967818
work_keys_str_mv AT minglianglee improvingtheperformanceofequipmentdesigndevelopmentthroughsubprocesses
AT lǐmíngliáng improvingtheperformanceofequipmentdesigndevelopmentthroughsubprocesses
AT minglianglee yǐcìliúchénggǎijìnshèbèishèjìkāifādejīxiào
AT lǐmíngliáng yǐcìliúchénggǎijìnshèbèishèjìkāifādejīxiào
_version_ 1718284601813630976