USING VALUE AT RISK TO ANALYZE PROBABLE MAXIMUM LOSS OF CIVIL ENGINEERING PROJECTS IN TAIWAN AREA
碩士 === 銘傳大學 === 風險管理與保險學系碩士在職專班 === 94 === Insurer or insurance superintendent couldn''t recognize the degree of risk at any moment due to that the risks of civil engineering projects are intricate and the Contractor’s All Risk Insurance (CAR) policy is non-renewable. It results in insuffi...
Main Authors: | Wan-Tsung Yu, 游萬聰 |
---|---|
Other Authors: | Cheng-Ming Lin |
Format: | Others |
Language: | zh-TW |
Published: |
2006
|
Online Access: | http://ndltd.ncl.edu.tw/handle/25a4cx |
Similar Items
-
A study on VaR Model Used to Estimate the Maximum Probable Loss of CPM in Taiwan
by: Chin-Ti Yu, et al.
Published: (2010) -
ON THE STUDY OF MAXIMUM PROBABLE LOSS FOR HULL INSURANCE BY USE OF VALUE-AT-RISK
by: Wei-Chung Hung, et al.
Published: (2008) -
Effects of variability in probable maximum precipitation patterns on flood losses
by: A. P. Zischg, et al.
Published: (2018-05-01) -
Statistical estimates of probable maximum precipitation for Taiwan
by: ZHU, YUN-LONG, et al.
Published: (1988) -
Analyzing Uncertainty in Probable Maximum Precipitation Estimation using the Moisture Maximization Method
by: Youngkyu, Kim
Published: (2021)