Modeling and Heuristics of Pilot-Run Products with the Theory of Constraints — as the Case for Semiconductor Seal Factory
碩士 === 國立高雄應用科技大學 === 工業工程與管理系碩士班 === 94 === Abstract Because of fast variation of high-tech and market, the phase of pilot-run before promoting new products becomes more valuable. However present managers emphasize mass production on all areas of production management, such as capability planning,...
Main Authors: | Chun-Chung Wu, 吳俊璟 |
---|---|
Other Authors: | Shan-Yau Wu |
Format: | Others |
Language: | zh-TW |
Published: |
2006
|
Online Access: | http://ndltd.ncl.edu.tw/handle/97468900290978970447 |
Similar Items
-
Research of the Heuristic Dispatching Rule and Genetic Algorithm in Semiconductor Manufacturing Factory
by: Tzu-Chen Huang, et al.
Published: (1999) -
Parallel-processors flowshop scheduling problem with heuristic methods for semiconductor factories
by: YE, LI-REN, et al.
Published: (1993) -
The Heuristic Dispatching Method of Automatic Material Handling System in 300mm Semiconductor Factory
by: Nan-Hsiang Huang, et al.
Published: (2008) -
Applying queuing theory in OEE improvement at a semiconductor factory
by: Hung-Chung Ho, et al.
Published: (2014) -
Design and Implementation of an Advanced Semiconductor Run-to-Run Process Control System
by: Chun-Ling Wang, et al.
Published: (2006)