Analytic Study on the Centralized Management Scheme of Waste Incinerator Ashes in Central Taiwan

碩士 === 大葉大學 === 環境工程學系碩士班 === 94 === Abstract Before the end of 2004, Central Taiwan has pushed the policy of trash incinerating. Up to now, there are four large-scale trash incinerators in Taichung city, Taichung County, and Chang Hwa County. Which cause ashes are processed via landfill, however,...

Full description

Bibliographic Details
Main Authors: chiang peiken, 江培根
Other Authors: 李康文
Format: Others
Language:zh-TW
Published: 2006
Online Access:http://ndltd.ncl.edu.tw/handle/96171699108396174579
id ndltd-TW-094DYU00515007
record_format oai_dc
spelling ndltd-TW-094DYU005150072015-10-13T11:57:26Z http://ndltd.ncl.edu.tw/handle/96171699108396174579 Analytic Study on the Centralized Management Scheme of Waste Incinerator Ashes in Central Taiwan 台灣中部地區垃圾焚化爐灰渣集中管理之量化模式探討 chiang peiken 江培根 碩士 大葉大學 環境工程學系碩士班 94 Abstract Before the end of 2004, Central Taiwan has pushed the policy of trash incinerating. Up to now, there are four large-scale trash incinerators in Taichung city, Taichung County, and Chang Hwa County. Which cause ashes are processed via landfill, however, this way makes our environment unhealthy. In ashes, bottom ashes are in majority but low damage. Now, we are finding the fittest methods to decrease the loading of landfill and drive metal materials in ashes recycling then using residues of silicic acid salt to be substitute. The research use Analytical Hierarchy Process (AHP) to establish estimation levels to proceed processionals & scholars investigating and matrix mathematical calculations to get the best method of ashes centralizing & recycling plant in Central Taiwan. Of course, financial affairs are also the main point for investors and sponsors when locals participates public development. The research will do feasibility evaluation、setting hypothetical parameters、estimating cost and profit of investment、net present-value(NPV)、internal rate of return(IRR)、discounted payback(DPB)、finance feasible analyzing、and sensitive analyzing for the reference to investors and sponsors. Total evaluation results display ashes recycling plant building has to pay much attention to the effects of environment. Nan-tung district, Taichung City, predominates the hydrology、geology、ground using、engineering cost、ecology、and present environment over others cities, which is the best one to build ashes recycling plant in Central Taiwan. Regarding to financial evaluation, the business profit will affect planning which if feasible and will of investors. For this reason, we must consider to select area-across cooperation to decrease cost of entrusting operation. In addition, we have to promise years of entrusting operation and the lowest hand over tons to reduce risks of investors but increase locals’ investment pleasure. 李康文 2006 學位論文 ; thesis 203 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 大葉大學 === 環境工程學系碩士班 === 94 === Abstract Before the end of 2004, Central Taiwan has pushed the policy of trash incinerating. Up to now, there are four large-scale trash incinerators in Taichung city, Taichung County, and Chang Hwa County. Which cause ashes are processed via landfill, however, this way makes our environment unhealthy. In ashes, bottom ashes are in majority but low damage. Now, we are finding the fittest methods to decrease the loading of landfill and drive metal materials in ashes recycling then using residues of silicic acid salt to be substitute. The research use Analytical Hierarchy Process (AHP) to establish estimation levels to proceed processionals & scholars investigating and matrix mathematical calculations to get the best method of ashes centralizing & recycling plant in Central Taiwan. Of course, financial affairs are also the main point for investors and sponsors when locals participates public development. The research will do feasibility evaluation、setting hypothetical parameters、estimating cost and profit of investment、net present-value(NPV)、internal rate of return(IRR)、discounted payback(DPB)、finance feasible analyzing、and sensitive analyzing for the reference to investors and sponsors. Total evaluation results display ashes recycling plant building has to pay much attention to the effects of environment. Nan-tung district, Taichung City, predominates the hydrology、geology、ground using、engineering cost、ecology、and present environment over others cities, which is the best one to build ashes recycling plant in Central Taiwan. Regarding to financial evaluation, the business profit will affect planning which if feasible and will of investors. For this reason, we must consider to select area-across cooperation to decrease cost of entrusting operation. In addition, we have to promise years of entrusting operation and the lowest hand over tons to reduce risks of investors but increase locals’ investment pleasure.
author2 李康文
author_facet 李康文
chiang peiken
江培根
author chiang peiken
江培根
spellingShingle chiang peiken
江培根
Analytic Study on the Centralized Management Scheme of Waste Incinerator Ashes in Central Taiwan
author_sort chiang peiken
title Analytic Study on the Centralized Management Scheme of Waste Incinerator Ashes in Central Taiwan
title_short Analytic Study on the Centralized Management Scheme of Waste Incinerator Ashes in Central Taiwan
title_full Analytic Study on the Centralized Management Scheme of Waste Incinerator Ashes in Central Taiwan
title_fullStr Analytic Study on the Centralized Management Scheme of Waste Incinerator Ashes in Central Taiwan
title_full_unstemmed Analytic Study on the Centralized Management Scheme of Waste Incinerator Ashes in Central Taiwan
title_sort analytic study on the centralized management scheme of waste incinerator ashes in central taiwan
publishDate 2006
url http://ndltd.ncl.edu.tw/handle/96171699108396174579
work_keys_str_mv AT chiangpeiken analyticstudyonthecentralizedmanagementschemeofwasteincineratorashesincentraltaiwan
AT jiāngpéigēn analyticstudyonthecentralizedmanagementschemeofwasteincineratorashesincentraltaiwan
AT chiangpeiken táiwānzhōngbùdeqūlājīfénhuàlúhuīzhājízhōngguǎnlǐzhīliànghuàmóshìtàntǎo
AT jiāngpéigēn táiwānzhōngbùdeqūlājīfénhuàlúhuīzhājízhōngguǎnlǐzhīliànghuàmóshìtàntǎo
_version_ 1716851892489814016