Model for Construction Labor Job Assignment Considering Energy Consumption Optimization
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 94 === Construction jobs such as steel and form assembly usually require labors involving intensive physical workload,If the workload placed on the worker is too high in relation to the person’s capacity for sustained physical work, fatigue unavoidably will develop. In...
Main Authors: | Yi-Rui Chen, 陳怡叡 |
---|---|
Other Authors: | Tao-ming Cheng |
Format: | Others |
Language: | zh-TW |
Published: |
2006
|
Online Access: | http://ndltd.ncl.edu.tw/handle/p3u2py |
Similar Items
-
Labor Job Assignment Considering Energy Consumption Leveling
by: Yuan-hung Tsai, et al.
Published: (2005) -
Task Assignment Optimization for Labors Considering Labor’s Physical Energy Expenditure
by: Dong-Xing Wang, et al.
Published: (2007) -
A Labor Work Assignment Model Considering Energy Expenditure and Work Duration
by: Wen-Ta Hsiao, et al.
Published: (2009) -
Assignment optimization of multiskilled foreign labor for construction industry.
by: Chen Chiang, et al.
Published: (2006) -
Optimization of Short-Term Labor Force Assignments in Construction
by: Wei-wu Yu, et al.
Published: (2008)