A Study of Job Shop Scheduling Problem with Parallel Machine and Reentrant Process
碩士 === 中原大學 === 工業工程研究所 === 94 === This research developed a scheduling algorithm for Job Shop Scheduling Problem with reentrant characteristics and parallel machines of different production rates. This algorithm has four modules: input module, machine selection module, scheduling module, and outpu...
Main Authors: | Jheng-Jynn Wu, 吳政俊 |
---|---|
Other Authors: | James Chien-Liang Chen |
Format: | Others |
Language: | zh-TW |
Published: |
2006
|
Online Access: | http://ndltd.ncl.edu.tw/handle/96664937922864876283 |
Similar Items
-
Reentrant Flow Shop Scheduling Problems in Two-Machine Systems
by: Weng, Cheng-Yi, et al. -
Critical arc strategies for the reentrant job shop scheduling problem with setups
by: Zoghby, Jeriad Marcus
Published: (2008) -
Parallel Machine Scheduling with Minimal and Maximal Time Lags for Reentrant Job
by: Pei-Yun Chan, et al.
Published: (2007) -
The Flow-shop Scheduling Problem with Reentrant Consideration
by: Fu-chi Shih, et al.
Published: (2008) -
Multi-Stage Job Shop Scheduling Problem with Sequence-Dependent Setup Time and Reentrant Consideration
by: Kai-Cyun Chen, et al.
Published: (2011)