A Study of Taiwan High Speed Rail C260 Supply Chain Model using the concept of SCOR
碩士 === 國立雲林科技大學 === 營建工程系碩士班 === 93 === The features of construction supply chain project cover all different kinds of product, service, and commercial benefits. And they have temporary supply chain characters. The members of supply chain integrate always in order to product “only-one-time” operatio...
Main Authors: | Shin-Wua Chen, 陳秀華 |
---|---|
Other Authors: | none |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/51731292525311176358 |
Similar Items
-
A Study on Investigating Resource Combination Problem of Supply Chain Model of FPLM Using Dynamic Simulation Analysis- A Case Study C260 of Taiwan High Speed Rail Project
by: Kuei-Yen Chen, et al.
Published: (2005) -
The Research of System Dynamic in Construction Simulation –A Case Study of Bridge Structure in Taiwan High Speed Rail C260
by: Chi-Jin Wu, et al.
Published: (2006) -
A Study Using SCOR in Construction Project Supply Chain
by: Yun-Pei Chen, et al.
Published: (2006) -
Pengukuran Kinerja Supply Chain Dengan Pendekatan Supply Chain Operation References (SCOR)
by: Rizki Wahyuniardi, et al.
Published: (2017-12-01) -
A Design Methodology for SCOR-Based Supply Chain Simulation
by: 賴俊翰
Published: (2005)