Summary: | 碩士 === 國立臺北科技大學 === 土木與防災研究所 === 93 === No matter in Taiwan or other country , the common characteristics of the building engineering are that material kinds are numerous, the required spaces for making place are huge, fast cash flow, heavy stock amount, material transport difficulty, customer require pluralism ,and etc.. Among these, construction industry can be easily found that the quality of logistics management has big influence of each construction projects. Each construction project may lose a great amount of supplies or profit due to the improper logistics management, and the risk of disadvantageous loss to construction industry, mainly result from the experience principle that construction industry is used to. In another word, there is no change from the past to the future. So for such various types and huge quantity of material, the well pre-planning with PDCA circulation to improve the efficiency and the utility at the construction job-site will be a valuable research.
Taiwan is stepping into the management environment of global internationalized competition now, the purpose of this research is to discuss the possible way on pre-planning of logistics management before practice of construction industry, also to analyze the storing situation and the movement of the supply, to exam and improve the pre-planning activity. By doing so, this research expects to improve the efficiency of logistics operation in building engineering of the whole construction industry. This research also uses the practical case to verify all the related applications, such as applying the logistics management of manufacturing industry into building engineering in order to outline the more efficient allocation at the construction job-site and to shorten the time schedule of the project, and to reduce the material expenditure.
|