The Selection of Advanced Planning and Scheduling System Applying Analytic Network Process
碩士 === 南台科技大學 === 企業管理系 === 93 === Enterprise Resource Planning (ERP) is planned and suited for the stable market demand, so it’s far away from responding the high volatility market. Hence, for the reasons such as highly changing environment, limited equipment productivity, and irregular customer or...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/28555840431181966731 |
id |
ndltd-TW-093STUT0121026 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-093STUT01210262016-11-22T04:12:14Z http://ndltd.ncl.edu.tw/handle/28555840431181966731 The Selection of Advanced Planning and Scheduling System Applying Analytic Network Process 應用分析網路程序法評選先進規劃與排程系統之研究 Cheng Han Sheng 鄭涵聖 碩士 南台科技大學 企業管理系 93 Enterprise Resource Planning (ERP) is planned and suited for the stable market demand, so it’s far away from responding the high volatility market. Hence, for the reasons such as highly changing environment, limited equipment productivity, and irregular customer orders...etc., we suggest the company should initiate the Advanced Planning and Scheduling (APS) system for the commitment of customer needs. However, to implement the APS system, firms can either by purchasing or by self-developing. In the view of the APS system is a set of complicated software, and the firm’s self-developing costs and resources would larger than the buying software package directly, so there are some more decision factors need to concern for successfully setting up the APS system. According to Boston AMR research center reports, the return on invested capital is 300% more of the APS installed companies. Therefore, this study attempts to discuss how to evaluate the APS software, and to establish the viable evaluation criteria for bring out the best software supplier. For the interdependence problems that may counter in the evaluation procedure, we use the Analytic Network Process (ANP) to run the applicable evaluation model. We then take case from a small and medium enterprise to demonstrate the evaluation framework. 丁志宏 2005 學位論文 ; thesis 133 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 南台科技大學 === 企業管理系 === 93 === Enterprise Resource Planning (ERP) is planned and suited for the stable market demand, so it’s far away from responding the high volatility market. Hence, for the reasons such as highly changing environment, limited equipment productivity, and irregular customer orders...etc., we suggest the company should initiate the Advanced Planning and Scheduling (APS) system for the commitment of customer needs.
However, to implement the APS system, firms can either by purchasing or by self-developing. In the view of the APS system is a set of complicated software, and the firm’s self-developing costs and resources would larger than the buying software package directly, so there are some more decision factors need to concern for successfully setting up the APS system.
According to Boston AMR research center reports, the return on invested capital is 300% more of the APS installed companies. Therefore, this study attempts to discuss how to evaluate the APS software, and to establish the viable evaluation criteria for bring out the best software supplier. For the interdependence problems that may counter in the evaluation procedure, we use the Analytic Network Process (ANP) to run the applicable evaluation model. We then take case from a small and medium enterprise to demonstrate the evaluation framework.
|
author2 |
丁志宏 |
author_facet |
丁志宏 Cheng Han Sheng 鄭涵聖 |
author |
Cheng Han Sheng 鄭涵聖 |
spellingShingle |
Cheng Han Sheng 鄭涵聖 The Selection of Advanced Planning and Scheduling System Applying Analytic Network Process |
author_sort |
Cheng Han Sheng |
title |
The Selection of Advanced Planning and Scheduling System Applying Analytic Network Process |
title_short |
The Selection of Advanced Planning and Scheduling System Applying Analytic Network Process |
title_full |
The Selection of Advanced Planning and Scheduling System Applying Analytic Network Process |
title_fullStr |
The Selection of Advanced Planning and Scheduling System Applying Analytic Network Process |
title_full_unstemmed |
The Selection of Advanced Planning and Scheduling System Applying Analytic Network Process |
title_sort |
selection of advanced planning and scheduling system applying analytic network process |
publishDate |
2005 |
url |
http://ndltd.ncl.edu.tw/handle/28555840431181966731 |
work_keys_str_mv |
AT chenghansheng theselectionofadvancedplanningandschedulingsystemapplyinganalyticnetworkprocess AT zhènghánshèng theselectionofadvancedplanningandschedulingsystemapplyinganalyticnetworkprocess AT chenghansheng yīngyòngfēnxīwǎnglùchéngxùfǎpíngxuǎnxiānjìnguīhuàyǔpáichéngxìtǒngzhīyánjiū AT zhènghánshèng yīngyòngfēnxīwǎnglùchéngxùfǎpíngxuǎnxiānjìnguīhuàyǔpáichéngxìtǒngzhīyánjiū AT chenghansheng selectionofadvancedplanningandschedulingsystemapplyinganalyticnetworkprocess AT zhènghánshèng selectionofadvancedplanningandschedulingsystemapplyinganalyticnetworkprocess |
_version_ |
1718396229678792704 |