A study on resource-constrained multi-project scheduling with learning and forgetting considerations

碩士 === 國立屏東科技大學 === 工業管理系 === 93 === In compliance with the trend of competitive environment, a business capable with cost estimation and timing of activity on project bidding is critical both for operation processing and profit making. For a project characterized as repetitive procedures, effects o...

Full description

Bibliographic Details
Main Author: 王哲宏
Other Authors: 蔡登茂
Format: Others
Language:zh-TW
Published: 2005
Online Access:http://ndltd.ncl.edu.tw/handle/46820788578569134309
id ndltd-TW-093NPUST041004
record_format oai_dc
spelling ndltd-TW-093NPUST0410042016-12-22T04:12:22Z http://ndltd.ncl.edu.tw/handle/46820788578569134309 A study on resource-constrained multi-project scheduling with learning and forgetting considerations 具學習與遺忘考慮之有限資源多專案排程之研究 王哲宏 碩士 國立屏東科技大學 工業管理系 93 In compliance with the trend of competitive environment, a business capable with cost estimation and timing of activity on project bidding is critical both for operation processing and profit making. For a project characterized as repetitive procedures, effects of learning experience and forgetting period resulting in consequential operations are main factors to determine the variation of the net present value. Systematically, this study considers the time value of money with the effects of learning experience and forgetting periods into the resource-constrained multi-project scheduling problem to develop two efficient solution procedures in terms of the optimal model and the genetic algorithm. To test the superiority of model and algorithm proposed in this work, a comparison between the developed heuristic rule and current heuristic rules is also conducted followed by an analysis on key factor affecting the project scheduling performance. The implementation results indicate that the heuristic rule proposed in this work is superior the current heuristic rules and effects of learning experience and forgetting period are significant. As a result, this study recommends a decision maker should consider such features into project planning. In addition, the proposed search heuristic rule is helpful for project managers as a means cons reduction on project scheduling. 蔡登茂 2005 學位論文 ; thesis 79 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立屏東科技大學 === 工業管理系 === 93 === In compliance with the trend of competitive environment, a business capable with cost estimation and timing of activity on project bidding is critical both for operation processing and profit making. For a project characterized as repetitive procedures, effects of learning experience and forgetting period resulting in consequential operations are main factors to determine the variation of the net present value. Systematically, this study considers the time value of money with the effects of learning experience and forgetting periods into the resource-constrained multi-project scheduling problem to develop two efficient solution procedures in terms of the optimal model and the genetic algorithm. To test the superiority of model and algorithm proposed in this work, a comparison between the developed heuristic rule and current heuristic rules is also conducted followed by an analysis on key factor affecting the project scheduling performance. The implementation results indicate that the heuristic rule proposed in this work is superior the current heuristic rules and effects of learning experience and forgetting period are significant. As a result, this study recommends a decision maker should consider such features into project planning. In addition, the proposed search heuristic rule is helpful for project managers as a means cons reduction on project scheduling.
author2 蔡登茂
author_facet 蔡登茂
王哲宏
author 王哲宏
spellingShingle 王哲宏
A study on resource-constrained multi-project scheduling with learning and forgetting considerations
author_sort 王哲宏
title A study on resource-constrained multi-project scheduling with learning and forgetting considerations
title_short A study on resource-constrained multi-project scheduling with learning and forgetting considerations
title_full A study on resource-constrained multi-project scheduling with learning and forgetting considerations
title_fullStr A study on resource-constrained multi-project scheduling with learning and forgetting considerations
title_full_unstemmed A study on resource-constrained multi-project scheduling with learning and forgetting considerations
title_sort study on resource-constrained multi-project scheduling with learning and forgetting considerations
publishDate 2005
url http://ndltd.ncl.edu.tw/handle/46820788578569134309
work_keys_str_mv AT wángzhéhóng astudyonresourceconstrainedmultiprojectschedulingwithlearningandforgettingconsiderations
AT wángzhéhóng jùxuéxíyǔyíwàngkǎolǜzhīyǒuxiànzīyuánduōzhuānànpáichéngzhīyánjiū
AT wángzhéhóng studyonresourceconstrainedmultiprojectschedulingwithlearningandforgettingconsiderations
_version_ 1718403048399699968