Effects of the Budget Control System on Construction Quality – a Case Study of Military Construction Projects
碩士 === 國立高雄第一科技大學 === 營建工程所 === 93 === The budget control system takes budgeted figures as a performance indicator, and assessment regulations as a supporter. However, since the system operation merely focuses on the achievement rates of budgets to determine success or failure, whether quality can...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/05761301251120361602 |
id |
ndltd-TW-093NKIT5512029 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-093NKIT55120292016-06-06T04:11:06Z http://ndltd.ncl.edu.tw/handle/05761301251120361602 Effects of the Budget Control System on Construction Quality – a Case Study of Military Construction Projects 預算控管機制對品質之影響-以軍事工程為例 Wei-min Jaw 趙維民 碩士 國立高雄第一科技大學 營建工程所 93 The budget control system takes budgeted figures as a performance indicator, and assessment regulations as a supporter. However, since the system operation merely focuses on the achievement rates of budgets to determine success or failure, whether quality can also be emphasized when the system is applied to military constructions is worthy of discussions. This research uses military construction projescts as study samples to examine the effects of the budget control system on construction quality. First of all, information related to work performances, overall quality management, and present budget control methods for military construction projects were obtained through literature reviews in an attempt to confirm if the current budget control system was applicable. Further, based on the experts’ viewpoints expressed in the interviews, comparative analyses in six projects with or without performance pressure were carried out on construction rates and fault checks. The results can be concluded as follows: 1. When military constructions are confined by a budget control system, the responsible staffs, under the performance pressure, may have no alternative but to “simplify the procedures for quality control operations”, that is, reducing inspection frequency, lowering the quality standard, ignoring fault rectification, and etc., all of which may lead to the reduction of construction quality. 2. Procrastination on military construction projects partly results from the uncertainty of project planning, the lack of staff competency, and the high frequency of staff transfers during project planning. It is suggested to institute staff training, impart related experiences, establish guidelines for staff shifts/promotions and standard operating procedures, accomplish project planning in advance, and shift the focus back onto construction contracts to eliminate the methods detrimental the construction quality. Wei Lo 羅維 2005 學位論文 ; thesis 48 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立高雄第一科技大學 === 營建工程所 === 93 === The budget control system takes budgeted figures as a performance indicator, and assessment regulations as a supporter. However, since the system operation merely focuses on the achievement rates of budgets to determine success or failure, whether quality can also be emphasized when the system is applied to military constructions is worthy of discussions.
This research uses military construction projescts as study samples to examine the effects of the budget control system on construction quality. First of all, information related to work performances, overall quality management, and present budget control methods for military construction projects were obtained through literature reviews in an attempt to confirm if the current budget control system was applicable. Further, based on the experts’ viewpoints expressed in the interviews, comparative analyses in six projects with or without performance pressure were carried out on construction rates and fault checks. The results can be concluded as follows: 1. When military constructions are confined by a budget control system, the responsible staffs, under the performance pressure, may have no alternative but to “simplify the procedures for quality control operations”, that is, reducing inspection frequency, lowering the quality standard, ignoring fault rectification, and etc., all of which may lead to the reduction of construction quality. 2. Procrastination on military construction projects partly results from the uncertainty of project planning, the lack of staff competency, and the high frequency of staff transfers during project planning. It is suggested to institute staff training, impart related experiences, establish guidelines for staff shifts/promotions and standard operating procedures, accomplish project planning in advance, and shift the focus back onto construction contracts to eliminate the methods detrimental the construction quality.
|
author2 |
Wei Lo |
author_facet |
Wei Lo Wei-min Jaw 趙維民 |
author |
Wei-min Jaw 趙維民 |
spellingShingle |
Wei-min Jaw 趙維民 Effects of the Budget Control System on Construction Quality – a Case Study of Military Construction Projects |
author_sort |
Wei-min Jaw |
title |
Effects of the Budget Control System on Construction Quality – a Case Study of Military Construction Projects |
title_short |
Effects of the Budget Control System on Construction Quality – a Case Study of Military Construction Projects |
title_full |
Effects of the Budget Control System on Construction Quality – a Case Study of Military Construction Projects |
title_fullStr |
Effects of the Budget Control System on Construction Quality – a Case Study of Military Construction Projects |
title_full_unstemmed |
Effects of the Budget Control System on Construction Quality – a Case Study of Military Construction Projects |
title_sort |
effects of the budget control system on construction quality – a case study of military construction projects |
publishDate |
2005 |
url |
http://ndltd.ncl.edu.tw/handle/05761301251120361602 |
work_keys_str_mv |
AT weiminjaw effectsofthebudgetcontrolsystemonconstructionqualityacasestudyofmilitaryconstructionprojects AT zhàowéimín effectsofthebudgetcontrolsystemonconstructionqualityacasestudyofmilitaryconstructionprojects AT weiminjaw yùsuànkòngguǎnjīzhìduìpǐnzhìzhīyǐngxiǎngyǐjūnshìgōngchéngwèilì AT zhàowéimín yùsuànkòngguǎnjīzhìduìpǐnzhìzhīyǐngxiǎngyǐjūnshìgōngchéngwèilì |
_version_ |
1718295172300668928 |