INCURRED CONTRACTOR’S COSTS DUE TO EXCUSABLE AND COMPENSABLE CONSTRUCTION DELAYS
碩士 === 國立中央大學 === 土木工程學系碩士在職專班 === 93 === Contractor’s costs incur due to construction delays. Among the delays, the contractor may claim incurred costs for excusable and compensable delays. The research analyzes the cost items that may incur due to the delays. A comprehensive check list as well as...
Main Authors: | Ying-Ben Chen, 陳英本 |
---|---|
Other Authors: | Nai-Jia Yao |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/17904922042120955767 |
Similar Items
-
INCURRED CONSTRACTOR'S COSTS DUE TO EXCUSABLE DELAYS-FOCUS ON PUBLIC CONSTRUCTION
by: Ya-Shuan Lee, et al.
Published: (2011) -
Non-excusable delays in construction
by: Abdul Majid, Muhammad Zaimi
Published: (1997) -
Analysis Of Non-excusable Delay Factors Influencing Contractors' Performance In Lagos State, Nigeria
by: Ibironke, Olajide Timothy, et al.
Published: (2013) -
Non Excusable Delays in Construction Industry: A Causal Study
by: S. H. Khahro, et al.
Published: (2018-12-01) -
Extension of Time and Incurred Costs in Public Construction
by: HSIAO,CHING-YIN, et al.
Published: (2017)