A Side-Constrained Highway Multiple Objective Origin-Destination Estimation Problem
碩士 === 國立中央大學 === 土木工程研究所 === 93 === Abstract Ramp metering control is one of the strategies to maintain traffic flows to satisfy a certain level of service in highway. However, the most ramp metering controls nowadays focus on single ramp and are pretimed without a concern of whole system. In the f...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/39289948910619854909 |
id |
ndltd-TW-093NCU05015058 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-093NCU050150582015-10-13T11:53:58Z http://ndltd.ncl.edu.tw/handle/39289948910619854909 A Side-Constrained Highway Multiple Objective Origin-Destination Estimation Problem 含額外限制高速公路多目標起迄旅次矩陣推估模型之研究 Chang-Hwang Lee 李長晃 碩士 國立中央大學 土木工程研究所 93 Abstract Ramp metering control is one of the strategies to maintain traffic flows to satisfy a certain level of service in highway. However, the most ramp metering controls nowadays focus on single ramp and are pretimed without a concern of whole system. In the following study, we will formulate estimating multi-objective O-D matrices model based on user-equilibrium principle, the lowest travel time cost, and risk value to fit a certain level of service in highway. To make some progress to solve the problem, we suggest constructing a supernetwork and proceed with Frank-Wolfe method combining largrangian relaxation to do traffic assignment. Finally, we take resulting O-D data of numerical examples to be the basis of the further research of bi-level optimal dynamic ramp metering strategy problem. Huey-Kuo Chen 陳惠國 2005 學位論文 ; thesis 81 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立中央大學 === 土木工程研究所 === 93 === Abstract
Ramp metering control is one of the strategies to maintain traffic flows to satisfy a certain level of service in highway. However, the most ramp metering controls nowadays focus on single ramp and are pretimed without a concern of whole system.
In the following study, we will formulate estimating multi-objective O-D matrices model based on user-equilibrium principle, the lowest travel time cost, and risk value to fit a certain level of service in highway. To make some progress to solve the problem, we suggest constructing a supernetwork and proceed with Frank-Wolfe method combining largrangian relaxation to do traffic assignment. Finally, we take resulting O-D data of numerical examples to be the basis of the further research of bi-level optimal dynamic ramp metering strategy problem.
|
author2 |
Huey-Kuo Chen |
author_facet |
Huey-Kuo Chen Chang-Hwang Lee 李長晃 |
author |
Chang-Hwang Lee 李長晃 |
spellingShingle |
Chang-Hwang Lee 李長晃 A Side-Constrained Highway Multiple Objective Origin-Destination Estimation Problem |
author_sort |
Chang-Hwang Lee |
title |
A Side-Constrained Highway Multiple Objective Origin-Destination Estimation Problem |
title_short |
A Side-Constrained Highway Multiple Objective Origin-Destination Estimation Problem |
title_full |
A Side-Constrained Highway Multiple Objective Origin-Destination Estimation Problem |
title_fullStr |
A Side-Constrained Highway Multiple Objective Origin-Destination Estimation Problem |
title_full_unstemmed |
A Side-Constrained Highway Multiple Objective Origin-Destination Estimation Problem |
title_sort |
side-constrained highway multiple objective origin-destination estimation problem |
publishDate |
2005 |
url |
http://ndltd.ncl.edu.tw/handle/39289948910619854909 |
work_keys_str_mv |
AT changhwanglee asideconstrainedhighwaymultipleobjectiveorigindestinationestimationproblem AT lǐzhǎnghuǎng asideconstrainedhighwaymultipleobjectiveorigindestinationestimationproblem AT changhwanglee hánéwàixiànzhìgāosùgōnglùduōmùbiāoqǐqìlǚcìjǔzhèntuīgūmóxíngzhīyánjiū AT lǐzhǎnghuǎng hánéwàixiànzhìgāosùgōnglùduōmùbiāoqǐqìlǚcìjǔzhèntuīgūmóxíngzhīyánjiū AT changhwanglee sideconstrainedhighwaymultipleobjectiveorigindestinationestimationproblem AT lǐzhǎnghuǎng sideconstrainedhighwaymultipleobjectiveorigindestinationestimationproblem |
_version_ |
1716849977714540544 |