A Short-term Wafer Probing Capacity Planning Model for IDM Company

碩士 === 國立交通大學 === 管理學院碩士在職專班工業工程與管理組 === 93 === In this study, we present a capacity planning model of a wafer probing system with a manufacturer, subcontractors and hybrid production systems of make-to-order (MTO) and make-to-stock (MTS). The manufacturer’s objectives are to meet due-dates of MTO p...

Full description

Bibliographic Details
Main Author: 謝瑞蓉
Other Authors: 許錫美
Format: Others
Language:zh-TW
Published: 2005
Online Access:http://ndltd.ncl.edu.tw/handle/09730339661014571626
id ndltd-TW-093NCTU5031016
record_format oai_dc
spelling ndltd-TW-093NCTU50310162015-10-13T12:56:37Z http://ndltd.ncl.edu.tw/handle/09730339661014571626 A Short-term Wafer Probing Capacity Planning Model for IDM Company IDM廠短期針測產能規劃模式之構建 謝瑞蓉 碩士 國立交通大學 管理學院碩士在職專班工業工程與管理組 93 In this study, we present a capacity planning model of a wafer probing system with a manufacturer, subcontractors and hybrid production systems of make-to-order (MTO) and make-to-stock (MTS). The manufacturer’s objectives are to meet due-dates of MTO products and stock levels of MTS products. A two-stage approach was developed. In first-stage, an LP model was formulated to allocate machines for MTO products in the manufacturer’s factory. Then, using the outputs of first-stage, an LP model was constructed to allocate MTS products to manufacturer’s factory and each subcontractors and to determine subcontractors’ machines. Finally, we present a near real case to illustrate the two-stage approach and a simulation model was built to evaluate the performances. 許錫美 2005 學位論文 ; thesis 47 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立交通大學 === 管理學院碩士在職專班工業工程與管理組 === 93 === In this study, we present a capacity planning model of a wafer probing system with a manufacturer, subcontractors and hybrid production systems of make-to-order (MTO) and make-to-stock (MTS). The manufacturer’s objectives are to meet due-dates of MTO products and stock levels of MTS products. A two-stage approach was developed. In first-stage, an LP model was formulated to allocate machines for MTO products in the manufacturer’s factory. Then, using the outputs of first-stage, an LP model was constructed to allocate MTS products to manufacturer’s factory and each subcontractors and to determine subcontractors’ machines. Finally, we present a near real case to illustrate the two-stage approach and a simulation model was built to evaluate the performances.
author2 許錫美
author_facet 許錫美
謝瑞蓉
author 謝瑞蓉
spellingShingle 謝瑞蓉
A Short-term Wafer Probing Capacity Planning Model for IDM Company
author_sort 謝瑞蓉
title A Short-term Wafer Probing Capacity Planning Model for IDM Company
title_short A Short-term Wafer Probing Capacity Planning Model for IDM Company
title_full A Short-term Wafer Probing Capacity Planning Model for IDM Company
title_fullStr A Short-term Wafer Probing Capacity Planning Model for IDM Company
title_full_unstemmed A Short-term Wafer Probing Capacity Planning Model for IDM Company
title_sort short-term wafer probing capacity planning model for idm company
publishDate 2005
url http://ndltd.ncl.edu.tw/handle/09730339661014571626
work_keys_str_mv AT xièruìróng ashorttermwaferprobingcapacityplanningmodelforidmcompany
AT xièruìróng idmchǎngduǎnqīzhēncèchǎnnéngguīhuàmóshìzhīgòujiàn
AT xièruìróng shorttermwaferprobingcapacityplanningmodelforidmcompany
_version_ 1716869630223450112