The development of simulation-based heuristics in solving parallel machine scheduling problem

碩士 === 國立成功大學 === 製造工程研究所碩博士班 === 93 ===  There are not only many machines installed in the work station of wire bonding of the semiconductor packing process, but also the bottleneck in this production line. The capabilities of the machines are different because of a lot of machines in the station,...

Full description

Bibliographic Details
Main Authors: Yu-An Shen, 沈育安
Other Authors: TahoYang
Format: Others
Language:zh-TW
Published: 2005
Online Access:http://ndltd.ncl.edu.tw/handle/33375438317264763464
id ndltd-TW-093NCKU5621007
record_format oai_dc
spelling ndltd-TW-093NCKU56210072017-06-05T04:45:18Z http://ndltd.ncl.edu.tw/handle/33375438317264763464 The development of simulation-based heuristics in solving parallel machine scheduling problem 以模擬為基礎之啟發式演算法求解平行機台排程問題 Yu-An Shen 沈育安 碩士 國立成功大學 製造工程研究所碩博士班 93  There are not only many machines installed in the work station of wire bonding of the semiconductor packing process, but also the bottleneck in this production line. The capabilities of the machines are different because of a lot of machines in the station, and times of purchased machines were different. Therefore, the wire bonding station is the classic uniform parallel machine problem. Schedule planning for parallel machines becomes the important factor of the improvement of production. In scheduling problem algorithms, the classic optimum schedule planning simplified the variables and conditions of process environment make the gap between model and real system. Furthermore, the simulation-based heuristic of intelligent search can not satisfied the requirement of in time for simulation. Therefore, this research will develop simulation-based heuristic algorithms to satisfy the requirement of immediately suggestion of scheduling.  In this research, we develop three simulation-based scheduling heuristics, there were push algorithm, pull algorithm, and grouping machines of pull algorithm. We simulated different conditions of production, to observe the responses of different algorithms for objectives of service level, average utilization, flow time, average time in system, average queue time. Afterwards, this research used the TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) to estimate this five objectives and computed the weight by AHP (Analytic Hierarchy Process) to find the satisfied scheduling algorithm. The result showed that the representation of pull algorithm were better than other two algorithms, and became the proposed scheduling method in this research. TahoYang 楊大和 2005 學位論文 ; thesis 104 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立成功大學 === 製造工程研究所碩博士班 === 93 ===  There are not only many machines installed in the work station of wire bonding of the semiconductor packing process, but also the bottleneck in this production line. The capabilities of the machines are different because of a lot of machines in the station, and times of purchased machines were different. Therefore, the wire bonding station is the classic uniform parallel machine problem. Schedule planning for parallel machines becomes the important factor of the improvement of production. In scheduling problem algorithms, the classic optimum schedule planning simplified the variables and conditions of process environment make the gap between model and real system. Furthermore, the simulation-based heuristic of intelligent search can not satisfied the requirement of in time for simulation. Therefore, this research will develop simulation-based heuristic algorithms to satisfy the requirement of immediately suggestion of scheduling.  In this research, we develop three simulation-based scheduling heuristics, there were push algorithm, pull algorithm, and grouping machines of pull algorithm. We simulated different conditions of production, to observe the responses of different algorithms for objectives of service level, average utilization, flow time, average time in system, average queue time. Afterwards, this research used the TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) to estimate this five objectives and computed the weight by AHP (Analytic Hierarchy Process) to find the satisfied scheduling algorithm. The result showed that the representation of pull algorithm were better than other two algorithms, and became the proposed scheduling method in this research.
author2 TahoYang
author_facet TahoYang
Yu-An Shen
沈育安
author Yu-An Shen
沈育安
spellingShingle Yu-An Shen
沈育安
The development of simulation-based heuristics in solving parallel machine scheduling problem
author_sort Yu-An Shen
title The development of simulation-based heuristics in solving parallel machine scheduling problem
title_short The development of simulation-based heuristics in solving parallel machine scheduling problem
title_full The development of simulation-based heuristics in solving parallel machine scheduling problem
title_fullStr The development of simulation-based heuristics in solving parallel machine scheduling problem
title_full_unstemmed The development of simulation-based heuristics in solving parallel machine scheduling problem
title_sort development of simulation-based heuristics in solving parallel machine scheduling problem
publishDate 2005
url http://ndltd.ncl.edu.tw/handle/33375438317264763464
work_keys_str_mv AT yuanshen thedevelopmentofsimulationbasedheuristicsinsolvingparallelmachineschedulingproblem
AT chényùān thedevelopmentofsimulationbasedheuristicsinsolvingparallelmachineschedulingproblem
AT yuanshen yǐmónǐwèijīchǔzhīqǐfāshìyǎnsuànfǎqiújiěpíngxíngjītáipáichéngwèntí
AT chényùān yǐmónǐwèijīchǔzhīqǐfāshìyǎnsuànfǎqiújiěpíngxíngjītáipáichéngwèntí
AT yuanshen developmentofsimulationbasedheuristicsinsolvingparallelmachineschedulingproblem
AT chényùān developmentofsimulationbasedheuristicsinsolvingparallelmachineschedulingproblem
_version_ 1718455570936102912