Application of MS PROJECT on the Project Management of Sewerage System- A case study of Sewerage System in Tainan
碩士 === 國立成功大學 === 水利及海洋工程學系碩博士班 === 93 === ABSTRACT The sewerage construction is an important indication for national construction development, which has certain degree of impact on the image and competition ability of a country. Many countries have made it as an important administration job. Acc...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/23582614833238503370 |
id |
ndltd-TW-093NCKU5083018 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-093NCKU50830182015-12-21T04:04:51Z http://ndltd.ncl.edu.tw/handle/23582614833238503370 Application of MS PROJECT on the Project Management of Sewerage System- A case study of Sewerage System in Tainan 應用MSPROJECT於污水下水道專案管理-以台南市污水下水道管網工程為例 Wen-Jer Su 蘇文哲 碩士 國立成功大學 水利及海洋工程學系碩博士班 93 ABSTRACT The sewerage construction is an important indication for national construction development, which has certain degree of impact on the image and competition ability of a country. Many countries have made it as an important administration job. According to “Challenge 2008: Important Plan of National Development ” approved on May 31, 2002 by Executive Yuan, the sewerage construction has been included in the sub-plan of the “Water and Green Construction” under item 9, which will be executed and mapped out by Construction & Planning Administration. It is planned to increase the pipe connection rate from 8% at end of 2001 to 20.3% by 2007 as a target. The promotion of the sewerage construction in Taiwan area will be an important project in the future. In view of the sewerage piping web construction is an inevitable ring of the overall sewerage system, the risky factor during the construction is critical to the success or failure of the construction, also it will affect the operation of the whole sewerage system. This study has aimed at the uncertain factors on site during sewerage piping web construction at southern Taiwan (Tainan county and city, Kaohsiung city) to do the questionnaire investigation from the expert, also, to analyze the quantitive risky value that will affect the degree of progress, further, to reflect such value on the whole construction period as well as itemized construction construction periods practically, and to investigate and prove then. Such information may offer the professional management personnel the choice, application and plan of risk management during the construction period such as: the appropriation of the pipe moving budget, follow-up the timetable for pipe moving, execution of earlier completion plan by contractor, etc., treatment strategy. The timing control of sewerage piping construction that applies MS Project expertise software, and take the sewerage piping and branch piping construction of Tainan City as example will have better efficiency on data acquirement, collection, processing, analysis, storage and use during the construction period, hoping to achieve the goal to upgrade the case management by computerized information technology. Besides, this study will also make use of the prompt character of the information technology to help the execution of the case management on sewerage construction. Pao-Shan Yu 游保杉 2005 學位論文 ; thesis 95 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立成功大學 === 水利及海洋工程學系碩博士班 === 93 === ABSTRACT
The sewerage construction is an important indication for national construction development, which has certain degree of impact on the image and competition ability of a country. Many countries have made it as an important administration job. According to “Challenge 2008: Important Plan of National Development ” approved on May 31, 2002 by Executive Yuan, the sewerage construction has been included in the sub-plan of the “Water and Green Construction” under item 9, which will be executed and mapped out by Construction & Planning Administration. It is planned to increase the pipe connection rate from 8% at end of 2001 to 20.3% by 2007 as a target. The promotion of the sewerage construction in Taiwan area will be an important project in the future.
In view of the sewerage piping web construction is an inevitable ring of the overall sewerage system, the risky factor during the construction is critical to the success or failure of the construction, also it will affect the operation of the whole sewerage system. This study has aimed at the uncertain factors on site during sewerage piping web construction at southern Taiwan (Tainan county and city, Kaohsiung city) to do the questionnaire investigation from the expert, also, to analyze the quantitive risky value that will affect the degree of progress, further, to reflect such value on the whole construction period as well as itemized construction construction periods practically, and to investigate and prove then. Such information may offer the professional management personnel the choice, application and plan of risk management during the construction period such as: the appropriation of the pipe moving budget, follow-up the timetable for pipe moving, execution of earlier completion plan by contractor, etc., treatment strategy.
The timing control of sewerage piping construction that applies MS Project expertise software, and take the sewerage piping and branch piping construction of Tainan City as example will have better efficiency on data acquirement, collection, processing, analysis, storage and use during the construction period, hoping to achieve the goal to upgrade the case management by computerized information technology. Besides, this study will also make use of the prompt character of the information technology to help the execution of the case management on sewerage construction.
|
author2 |
Pao-Shan Yu |
author_facet |
Pao-Shan Yu Wen-Jer Su 蘇文哲 |
author |
Wen-Jer Su 蘇文哲 |
spellingShingle |
Wen-Jer Su 蘇文哲 Application of MS PROJECT on the Project Management of Sewerage System- A case study of Sewerage System in Tainan |
author_sort |
Wen-Jer Su |
title |
Application of MS PROJECT on the Project Management of Sewerage System- A case study of Sewerage System in Tainan |
title_short |
Application of MS PROJECT on the Project Management of Sewerage System- A case study of Sewerage System in Tainan |
title_full |
Application of MS PROJECT on the Project Management of Sewerage System- A case study of Sewerage System in Tainan |
title_fullStr |
Application of MS PROJECT on the Project Management of Sewerage System- A case study of Sewerage System in Tainan |
title_full_unstemmed |
Application of MS PROJECT on the Project Management of Sewerage System- A case study of Sewerage System in Tainan |
title_sort |
application of ms project on the project management of sewerage system- a case study of sewerage system in tainan |
publishDate |
2005 |
url |
http://ndltd.ncl.edu.tw/handle/23582614833238503370 |
work_keys_str_mv |
AT wenjersu applicationofmsprojectontheprojectmanagementofseweragesystemacasestudyofseweragesystemintainan AT sūwénzhé applicationofmsprojectontheprojectmanagementofseweragesystemacasestudyofseweragesystemintainan AT wenjersu yīngyòngmsprojectyúwūshuǐxiàshuǐdàozhuānànguǎnlǐyǐtáinánshìwūshuǐxiàshuǐdàoguǎnwǎnggōngchéngwèilì AT sūwénzhé yīngyòngmsprojectyúwūshuǐxiàshuǐdàozhuānànguǎnlǐyǐtáinánshìwūshuǐxiàshuǐdàoguǎnwǎnggōngchéngwèilì |
_version_ |
1718154964911521792 |